IAC Assessment: SD0445
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Diego State University
Assessment Year 2012
Principal Product Reclaimed Water
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4952 - Sewerage Systems
Sales $1,000,000-$5,000,000
# of Employees 38
Plant Area (Sq.Ft.) 26,136,000
Annual Production 105 Units
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $651,004 8,793,785 kWh $0.07
Electricity Demand $274,516 15,524 kW-months/year $17.68
Electricity Fees $14,499 - $ -
Natural Gas $224,960 282,268 MMBtu $0.80
TOTAL ENERGY COSTS $1,164,979
RECOMMENDED SAVINGS* $576,130 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $480,737
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$33,123
Cost:
$1,878
$24,955 337,223 $8,168 462 - - - - $24,955
337,223
kWh
$8,168
462
kW-months/year
-
-
MMBtu
-
-
$
02: 2.5194 REDESIGN PROCESS Savings:
$30,890
Cost:
$14,775
$670 9,070 $220 12 - - $30,000 - $670
9,070
kWh
$220
12
kW-months/year
-
-
MMBtu
$30,000
-
$
03: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL Savings:
$64,503
Cost:
$109,675
$(-120,897) (-1,633,740) $(-39,568) (-2,238) $224,968 2,823 - - $(-120,897)
(-1,633,740)
kWh
$(-39,568)
(-2,238)
kW-months/year
$224,968
2,823
MMBtu
-
-
$
04: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$351,013
Cost:
$1,040,000
$354,911 4,796,100 $120,931 6,840 - - $(-124,830) - $354,911
4,796,100
kWh
$120,931
6,840
kW-months/year
-
-
MMBtu
$(-124,830)
-
$
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$11,844
Cost:
$39,150
- - - - $11,844 149 - - -
-
kWh
-
-
kW-months/year
$11,844
149
MMBtu
-
-
$
06: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$84,757
Cost:
$300,000
$310,183 4,191,660 $89,160 5,043 - - $(-314,585) - $310,183
4,191,660
kWh
$89,160
5,043
kW-months/year
-
-
MMBtu
$(-314,585)
-
$
TOTAL RECOMMENDED Savings:
$576,130
Cost:
$1,505,478
$569,822 7,700,313 $178,911 10,119 $236,812 2,971 $(-409,415) - $569,822
7,700,313
kWh
$178,911
10,119
kW-months/year
$236,812
2,971
MMBtu
$(-409,415)
-
$
TOTAL IMPLEMENTED Savings:
$480,737
Cost:
$1,381,028
$690,049 9,324,983 $218,259 12,345 $11,844 149 $(-439,415) - $690,049
9,324,983
kWh
$218,259
12,345
kW-months/year
$11,844
149
MMBtu
$(-439,415)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes