IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

268

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0444 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,090 $1,100 Not Implemented
SD0444 # 03 Y:2012 03 2012 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,113 $272 Implemented
SD0444 # 04 Y:2012 04 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $740 $653 Implemented
SD0444 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,560 $14,000 Not Implemented
SD0444 # 06 Y:2012 06 2012 INSTALL OCCUPANCY SENSORS $1,892 $3,792 Not Implemented
SD0444 # 07 Y:2012 07 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $28,752 $68,368 Not Implemented
SD0444 # 08 Y:2012 08 2012 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $7,873 $20,250 Not Implemented
SF0411 # 01 Y:2012 01 2012 COMBINE UTILITY METERS $35,266 $0 Implemented
SF0411 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,097 $504 Implemented
SF0411 # 03 Y:2012 03 2012 SCHEDULE USE OF ELEVATORS TO CONSERVE ENERGY $716 $0 Implemented
SF0411 # 04 Y:2012 04 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,666 $1,200 Implemented
SF0411 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,104 $6,660 Not Implemented
SF0411 # 06 Y:2012 06 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,094 $939 Implemented
SF0411 # 07 Y:2012 07 2012 USE MULTIPLE-EFFECT EVAPORATORS $14,245 $17,433 Not Implemented
SF0411 # 08 Y:2012 08 2012 RECOVER WASTE HEAT FROM EQUIPMENT $2,723 $3,965 Not Implemented
SF0411 # 09 Y:2012 09 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,671 $11,216 Not Implemented
SF0411 # 10 Y:2012 10 2012 INSTALL OCCUPANCY SENSORS $18,497 $47,901 Implemented
SF0411 # 11 Y:2012 11 2012 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $1,227 $3,774 Not Implemented
SF0411 # 12 Y:2012 12 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,986 $135,330 Implemented
SF0408 # 01 Y:2012 01 2012 AIR CONDITION ONLY SPACE NECESSARY $4,725 $0 Not Implemented
SF0408 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,111 $0 Implemented
SF0408 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,571 $80 Implemented
SF0408 # 04 Y:2012 04 2012 UTILIZE A LESS EXPENSIVE COOLING METHOD $3,344 $4,267 Not Implemented
SF0408 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $3,255 $11,297 Implemented
SF0408 # 06 Y:2012 06 2012 USE SOLAR HEAT TO MAKE ELECTRICTY $231,136 $1,514,353 Implemented