Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
315
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0537 # 10 Y:2016 | 10 | 2016 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $1,205 | $2,550 | Not Implemented |
SD0537 # 09 Y:2016 | 09 | 2016 | INSTALL OCCUPANCY SENSORS | $1,312 | $3,610 | Implemented |
SD0537 # 08 Y:2016 | 08 | 2016 | USE PHOTOCELL CONTROLS | $1,432 | $4,070 | Not Implemented |
SD0537 # 07 Y:2016 | 07 | 2016 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,758 | $5,550 | Not Implemented |
SD0537 # 06 Y:2016 | 06 | 2016 | REDUCE HEAT GAIN BY WINDOW TINTING | $2,089 | $7,880 | Not Implemented |
SD0537 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,406 | $10,314 | Implemented |
SD0537 # 03 Y:2016 | 03 | 2016 | OPTIMIZE PLANT POWER FACTOR | $10,293 | $10,000 | Not Implemented |
SD0537 # 02 Y:2016 | 02 | 2016 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $21,873 | $21,829 | Not Implemented |
SD0537 # 01 Y:2016 | 01 | 2016 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $23,109 | $108,180 | Not Implemented |
SF0488 # 08 Y:2016 | 08 | 2016 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $16,810 | $61,903 | Not Implemented |
SF0488 # 07 Y:2016 | 07 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,217 | $44,943 | Implemented |
SF0488 # 06 Y:2016 | 06 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $582 | $1,469 | Not Implemented |
SF0488 # 05 Y:2016 | 05 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,183 | $1,469 | Implemented |
SF0488 # 01 Y:2016 | 01 | 2016 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $14,980 | $0 | Implemented |
SF0488 # 02 Y:2016 | 02 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,509 | $840 | Implemented |
SF0488 # 03 Y:2016 | 03 | 2016 | INSULATE BARE EQUIPMENT | $6,138 | $882 | Implemented |
SF0488 # 04 Y:2016 | 04 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $464 | $70 | Not Implemented |
SF0489 # 04 Y:2016 | 04 | 2016 | INSTALL OCCUPANCY SENSORS | $2,079 | $8,593 | Implemented |
SF0489 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,283 | $39,636 | Implemented |
SF0489 # 02 Y:2016 | 02 | 2016 | INSULATE BARE EQUIPMENT | $3,011 | $3,675 | Not Implemented |
SF0489 # 01 Y:2016 | 01 | 2016 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $29,223 | $350 | Implemented |
SD0536 # 06 Y:2016 | 06 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,995 | $648 | Implemented |
SD0536 # 11 Y:2016 | 11 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,278 | $1,200 | Implemented |
SD0536 # 10 Y:2016 | 10 | 2016 | INSTALL OCCUPANCY SENSORS | $1,296 | $3,200 | Implemented |
SD0536 # 09 Y:2016 | 09 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,472 | $200 | Not Implemented |