IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

197

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0658 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $450 $2,400 Not Implemented
CO0495 # 02 Y:2001 02 2001 INSTALL OCCUPANCY SENSORS $1,860 $500 Implemented
CO0495 # 01 Y:2001 01 2001 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,590 $17,000 Implemented
CO0495 # 05 Y:2001 05 2001 REUSE / RECYCLE/ SELL PAPER PRODUCTS $9,900 $1,000 Implemented
CO0495 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $250 $0 Implemented
CO0495 # 03 Y:2001 03 2001 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $470 $500 Implemented
CO0469 # 01 Y:2000 01 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,000 $9,500 Implemented
CO0469 # 02 Y:2000 02 2000 RECOVER WASTE HEAT FROM EQUIPMENT $860 $2,270 Not Implemented
CO0469 # 03 Y:2000 03 2000 INSULATE BARE EQUIPMENT $590 $1,510 Implemented
CO0469 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $350 $0 Implemented
CO0469 # 05 Y:2000 05 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $730 $50 Implemented
CO0469 # 06 Y:2000 06 2000 $27,300 $20,000 Not Implemented
CO0469 # 07 Y:2000 07 2000 $22,100 $9,000 Implemented
CO0469 # 08 Y:2000 08 2000 $2,080 $1,200 Implemented
CO0303 # 07 Y:1994 07 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $900 $220 Implemented
CO0303 # 01 Y:1994 01 1994 RECOVER WASTE HEAT FROM EQUIPMENT $15,990 $55,130 Not Implemented
CO0303 # 02 Y:1994 02 1994 RECOVER WASTE HEAT FROM EQUIPMENT $10,760 $55,130 Not Implemented
CO0303 # 06 Y:1994 06 1994 REPAIR AND ELIMINATE STEAM LEAKS $2,100 $1,250 Implemented
CO0303 # 08 Y:1994 08 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $440 $1,280 Implemented
CO0303 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,780 $16,000 Not Implemented
CO0303 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,130 $5,790 Implemented
CO0303 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,150 $900 Not Implemented
CO0240 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $470 $290 Implemented
CO0240 # 05 Y:1992 05 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $290 $800 Implemented
CO0240 # 06 Y:1992 06 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $790 $3,090 Implemented