IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

244

matching recommendations
Reset
SIC 38 Instruments And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0686 # 05 Y:2014 05 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $6,080 $1,500 Implemented
CO0686 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,120 $4,630 Not Implemented
CO0682 # 04 Y:2014 04 2014 INSTALL OCCUPANCY SENSORS $1,250 $1,240 Not Implemented
CO0682 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,860 $5,750 Not Implemented
CO0682 # 01 Y:2014 01 2014 RECOVER WASTE HEAT FROM EQUIPMENT $4,080 $9,950 Not Implemented
CO0682 # 02 Y:2014 02 2014 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $42,490 $93,580 Not Implemented
CO0624 # 04 Y:2009 04 2009 USE SOLAR HEAT TO HEAT WATER $1,750 $11,200 Not Implemented
CO0624 # 05 Y:2009 05 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $510 $5,340 Not Implemented
CO0624 # 03 Y:2009 03 2009 USE SOLAR HEAT TO MAKE ELECTRICTY $1,750 $10,500 Not Implemented
CO0624 # 01 Y:2009 01 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,370 $3,610 Not Implemented
CO0624 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,440 $26,850 Not Implemented
CO0620 # 01 Y:2009 01 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,390 $10,070 Not Implemented
CO0620 # 03 Y:2009 03 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,980 $7,320 Not Implemented
CO0620 # 04 Y:2009 04 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,820 $5,850 Not Implemented
CO0620 # 02 Y:2009 02 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,190 $11,640 Not Implemented
CO0614 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,580 $1,500 Implemented
CO0614 # 02 Y:2008 02 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $1,670 $1,000 Implemented
CO0614 # 04 Y:2008 04 2008 USE SOLAR HEAT TO HEAT WATER $3,910 $84,000 Not Implemented
CO0614 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,010 $12,000 Implemented
CO0613 # 02 Y:2008 02 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $9,230 $3,000 Not Implemented
CO0613 # 05 Y:2008 05 2008 RECOVER WASTE HEAT FROM EQUIPMENT $6,330 $9,130 Implemented
CO0613 # 06 Y:2008 06 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,300 $39,600 Not Implemented
CO0613 # 07 Y:2008 07 2008 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,390 $1,000 Implemented
CO0613 # 01 Y:2008 01 2008 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $27,040 $12,030 Not Implemented
CO0613 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,500 $3,000 Implemented