Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
184
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0478 # 02 Y:2000 | 02 | 2000 | INSULATE BARE EQUIPMENT | $1,970 | $2,360 | Implemented |
CO0478 # 03 Y:2000 | 03 | 2000 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,550 | $5,200 | Implemented |
CO0478 # 01 Y:2000 | 01 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,280 | $4,000 | Implemented |
CO0478 # 07 Y:2000 | 07 | 2000 | INSTALL / REPAIR INSULATION ON STEAM LINES | $240 | $300 | Implemented |
CO0479 # 02 Y:2000 | 02 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,190 | $2,500 | Implemented |
CO0479 # 06 Y:2000 | 06 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $179,700 | $0 | Not Implemented |
CO0478 # 08 Y:2000 | 08 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $130 | $0 | Implemented |
CO0479 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,970 | $17,900 | n/a |
CO0479 # 05 Y:2000 | 05 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $390 | $60 | Not Implemented |
CO0479 # 03 Y:2000 | 03 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,180 | $12,990 | Not Implemented |
CO0478 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $510 | $290 | Implemented |
CO0478 # 06 Y:2000 | 06 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $280 | $60 | Implemented |
CO0479 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $400 | $110 | Implemented |
CO0478 # 05 Y:2000 | 05 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $400 | $1,370 | Implemented |
CO0478 # 09 Y:2000 | 09 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $6,350 | $12,000 | Implemented |
CO0477 # 06 Y:2000 | 06 | 2000 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $220 | $150 | Not Implemented |
CO0477 # 07 Y:2000 | 07 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20 | $0 | Not Implemented |
CO0477 # 02 Y:2000 | 02 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,530 | $2,000 | Not Implemented |
CO0477 # 05 Y:2000 | 05 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $450 | $1,060 | Not Implemented |
CO0477 # 03 Y:2000 | 03 | 2000 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,410 | $970 | Not Implemented |
CO0477 # 04 Y:2000 | 04 | 2000 | USE OPTIMUM TEMPERATURE | $1,050 | $200 | Not Implemented |
CO0477 # 01 Y:2000 | 01 | 2000 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,760 | $15,500 | Not Implemented |
CO0476 # 05 Y:2000 | 05 | 2000 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $16,290 | $13,500 | Not Implemented |
CO0476 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,240 | $2,400 | Implemented |
CO0476 # 06 Y:2000 | 06 | 2000 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $6,490 | $41,000 | Not Implemented |