Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
102
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0576 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,540 | $190 | Implemented |
CO0576 # 02 Y:2005 | 02 | 2005 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $4,450 | $0 | Not Implemented |
CO0576 # 01 Y:2005 | 01 | 2005 | INSTALL ROTATING CAROUSELS TO REDUCE SET-UP TIMES | $84,000 | $30,670 | Not Implemented |
CO0576 # 05 Y:2005 | 05 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $6,190 | $17,170 | Not Implemented |
CO0576 # 06 Y:2005 | 06 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,670 | $9,240 | Not Implemented |
CO0576 # 07 Y:2005 | 07 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,740 | $980 | Not Implemented |
CO0576 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $920 | $1,440 | Not Implemented |
CO0576 # 04 Y:2005 | 04 | 2005 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $200 | $170 | Implemented |
CO0575 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,270 | $4,000 | Implemented |
CO0575 # 12 Y:2005 | 12 | 2005 | INSTALL OCCUPANCY SENSORS | $150 | $390 | Not Implemented |
CO0575 # 05 Y:2005 | 05 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,370 | $600 | Implemented |
CO0575 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,710 | $200 | Implemented |
CO0575 # 02 Y:2005 | 02 | 2005 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $62,190 | $230,000 | Not Implemented |
CO0575 # 07 Y:2005 | 07 | 2005 | INSTALL SKYLIGHTS | $12,750 | $90,400 | Not Implemented |
CO0575 # 06 Y:2005 | 06 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $670 | $1,290 | Not Implemented |
CO0575 # 03 Y:2005 | 03 | 2005 | REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER | $4,750 | $1,150 | Implemented |
CO0575 # 01 Y:2005 | 01 | 2005 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $329,210 | $400,000 | Implemented |
CO0575 # 09 Y:2005 | 09 | 2005 | USE SOLAR HEAT TO HEAT MAKE-UP AIR | $2,170 | $23,570 | Not Implemented |
CO0575 # 10 Y:2005 | 10 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $760 | $1,050 | Implemented |
CO0575 # 11 Y:2005 | 11 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $400 | $440 | Implemented |
CO0571 # 08 Y:2005 | 08 | 2005 | INSTALL SKYLIGHTS | $6,230 | $56,000 | Not Implemented |
CO0571 # 09 Y:2005 | 09 | 2005 | USE SOLAR HEAT TO HEAT MAKE-UP AIR | $1,540 | $14,140 | Not Implemented |
CO0571 # 03 Y:2005 | 03 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,520 | $5,600 | Not Implemented |
CO0571 # 04 Y:2005 | 04 | 2005 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,540 | $3,240 | Not Implemented |
CO0571 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,580 | $500 | Implemented |