IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

155

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0621 # 04 Y:2007 04 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $646 $2,000 Not Implemented
MA0621 # 05 Y:2007 05 2007 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $405 $280 Implemented
MA0591 # 01 Y:2006 01 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,080 $82,975 Not Implemented
MA0591 # 02 Y:2006 02 2006 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $20,245 $77,830 Not Implemented
MA0591 # 03 Y:2006 03 2006 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $26,565 $37,830 Implemented
MA0591 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,411 $1,650 Implemented
MA0591 # 05 Y:2006 05 2006 INSTALL OCCUPANCY SENSORS $5,675 $1,820 Implemented
MA0591 # 06 Y:2006 06 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,143 $12,500 Implemented
MA0591 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $2,354 $5,390 Implemented
MA0591 # 08 Y:2006 08 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,780 $5,264 Implemented
MA0591 # 09 Y:2006 09 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,152 $260 Not Implemented
MA0588 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $3,404 $2,197 Implemented
MA0588 # 02 Y:2005 02 2005 USE MINIMUM STEAM OPERATING PRESSURE $2,294 $500 Implemented
MA0588 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,994 $1,242 Not Implemented
MA0588 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,132 $4,668 Implemented
MA0588 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $812 $2,599 Not Implemented
MA0586 # 01 Y:2005 01 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,190 $0 Not Implemented
MA0586 # 02 Y:2005 02 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,081 $140 Implemented
MA0586 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN WATER LINES AND VALVES $3,200 $0 Implemented
MA0586 # 04 Y:2005 04 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,415 $350 Not Implemented
MA0586 # 05 Y:2005 05 2005 COMBINE UTILITY METERS $1,736 $1,950 Implemented
MA0586 # 06 Y:2005 06 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $841 $1,646 Implemented
MA0586 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $443 $1,395 Implemented
MA0560 # 01 Y:2004 01 2004 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $42,752 $238,150 Implemented
MA0560 # 02 Y:2004 02 2004 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $32,756 $23,710 Implemented