IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

134

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0703 # 08 Y:2012 08 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $803 $1,200 Not Implemented
MA0703 # 09 Y:2012 09 2012 TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS $332 $150 Implemented
MA0681 # 01 Y:2011 01 2011 REDUCE VENTILATION AIR $6,162 $9,261 Implemented
MA0681 # 02 Y:2011 02 2011 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $1,294 $1,220 Not Implemented
MA0681 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $1,163 $1,265 Implemented
MA0681 # 04 Y:2011 04 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $768 $300 Not Implemented
MA0681 # 05 Y:2011 05 2011 INSULATE BARE EQUIPMENT $152 $80 Not Implemented
MA0433 # 07 Y:1999 07 1999 $6,150 $1,200 Not Implemented
MA0433 # 05 Y:1999 05 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,135 $0 Not Implemented
MA0433 # 04 Y:1999 04 1999 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,414 $0 Not Implemented
MA0433 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,317 $3,950 Implemented
MA0433 # 02 Y:1999 02 1999 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $9,704 $5,262 Not Implemented
MA0433 # 01 Y:1999 01 1999 $18,033 $25,200 Not Implemented
MA0433 # 06 Y:1999 06 1999 $2,000 $700 Not Implemented
MA0387 # 01 Y:1997 01 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,170 $8,401 Not Implemented
MA0387 # 03 Y:1997 03 1997 USE MAGNETIC TECHNOLOGY TO TREAT WATER $2,453 $5,640 Not Implemented
MA0387 # 04 Y:1997 04 1997 $3,251 $0 Implemented
MA0387 # 02 Y:1997 02 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $1,430 $1,230 Implemented
MA0387 # 05 Y:1997 05 1997 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $5,662 $21,410 Not Implemented
MA0346 # 05 Y:1995 05 1995 USE MINIMUM STEAM OPERATING PRESSURE $552 $1,160 Not Implemented
MA0346 # 02 Y:1995 02 1995 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $7,124 $30,000 Not Implemented
MA0346 # 04 Y:1995 04 1995 REPAIR OR REPLACE STEAM TRAPS $619 $300 Not Implemented
MA0346 # 03 Y:1995 03 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,744 $810 Not Implemented
MA0346 # 09 Y:1995 09 1995 RECOVER METALS FROM SPENT SOLUTIONS AND RECYCLE $14,227 $25,000 Not Implemented
MA0346 # 07 Y:1995 07 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $304 $700 Not Implemented