Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
29
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0243 # 10 Y:2006 | 10 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,687 | $7,500 | Not Implemented |
LE0243 # 09 Y:2006 | 09 | 2006 | INSTALL OCCUPANCY SENSORS | $995 | $525 | Not Implemented |
LE0243 # 08 Y:2006 | 08 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,925 | $2,000 | Not Implemented |
LE0243 # 07 Y:2006 | 07 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,824 | $80 | Not Implemented |
LE0243 # 06 Y:2006 | 06 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,730 | $2,400 | Not Implemented |
LE0243 # 05 Y:2006 | 05 | 2006 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $18,286 | $50,000 | Not Implemented |
LE0243 # 04 Y:2006 | 04 | 2006 | AIR CONDITION ONLY SPACE NECESSARY | $27,306 | $200 | Not Implemented |
LE0243 # 03 Y:2006 | 03 | 2006 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $27,533 | $20,000 | Not Implemented |
LE0243 # 02 Y:2006 | 02 | 2006 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $28,291 | $86,000 | Not Implemented |
LE0243 # 01 Y:2006 | 01 | 2006 | INSTALL WASTE HEAT BOILER TO PRODUCE STEAM | $193,808 | $200,000 | Not Implemented |
LE0239 # 02 Y:2006 | 02 | 2006 | REPAIR AND ELIMINATE STEAM LEAKS | $280,038 | $31,000 | Not Implemented |
LE0239 # 10 Y:2006 | 10 | 2006 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $355 | $500 | Not Implemented |
LE0239 # 01 Y:2006 | 01 | 2006 | INCREASE AMOUNT OF CONDENSATE RETURNED | $392,390 | $95,000 | Not Implemented |
LE0239 # 03 Y:2006 | 03 | 2006 | INCREASE AMOUNT OF CONDENSATE RETURNED | $204,235 | $200,000 | Not Implemented |
LE0239 # 04 Y:2006 | 04 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $115,069 | $20,000 | Not Implemented |
LE0239 # 05 Y:2006 | 05 | 2006 | COVER OPEN TANKS | $23,836 | $30,000 | Not Implemented |
LE0239 # 06 Y:2006 | 06 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $14,473 | $28,000 | Not Implemented |
LE0239 # 07 Y:2006 | 07 | 2006 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $10,599 | $7,500 | Not Implemented |
LE0239 # 08 Y:2006 | 08 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,312 | $2,528 | Not Implemented |
LE0239 # 09 Y:2006 | 09 | 2006 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,132 | $6,000 | Not Implemented |
LE0240 # 02 Y:2006 | 02 | 2006 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $74,790 | $800 | Not Implemented |
LE0240 # 01 Y:2006 | 01 | 2006 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $265,405 | $500,000 | Implemented |
LE0240 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,770 | $139,872 | Not Implemented |
LE0240 # 08 Y:2006 | 08 | 2006 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $192 | $300 | Implemented |
LE0240 # 07 Y:2006 | 07 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $331 | $300 | Implemented |