IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

257

matching recommendations
Reset
NAICS 334 Computer and Electronic Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0168 # 07 Y:2008 07 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $33,795 $22,516 Implemented
MI0168 # 08 Y:2008 08 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $22,202 $3,320 Implemented
MI0166 # 01 Y:2008 01 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $360,093 $695,000 Not Implemented
MI0166 # 02 Y:2008 02 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $70,996 $1,200 Implemented
MI0166 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,899 $41,800 Implemented
MI0166 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,060 $1,210 Implemented
MI0166 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,713 $40 Implemented
MI0166 # 06 Y:2008 06 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,677 $3,475 Not Implemented
MI0163 # 01 Y:2008 01 2008 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $600,000 $200,000 Implemented
MI0163 # 02 Y:2008 02 2008 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $10,234 $48,055 Not Implemented
MI0163 # 03 Y:2008 03 2008 INSULATE BARE EQUIPMENT $4,023 $1,957 Implemented
MI0163 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,724 $11,286 Implemented
MI0163 # 05 Y:2008 05 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,968 $2,151 Implemented
MI0145 # 01 Y:2007 01 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $26,104 $915 Implemented
MI0145 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,164 $45,864 Implemented
MI0145 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,811 $1,074 Not Implemented
MI0145 # 04 Y:2007 04 2007 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,005 $3,400 Not Implemented
MI0145 # 05 Y:2007 05 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,120 $1,175 Implemented
MI0145 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $945 $30 Not Implemented
MI0145 # 07 Y:2007 07 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $142 $225 Implemented
UF0376 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,968 $27,399 Not Implemented
UF0376 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,222 $2,053 Not Implemented
UF0376 # 03 Y:2006 03 2006 ADD AREA LIGHTING SWITCHES $878 $2,646 Not Implemented
UF0376 # 04 Y:2006 04 2006 $1,632,456 $5,315 Not Implemented
UF0376 # 05 Y:2006 05 2006 AIR CONDITION ONLY SPACE NECESSARY $1,014 $3,200 Not Implemented