Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
406
matching recommendationsNAICS | 336 | Transportation Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0428 # 05 Y:2023 | 05 | 2023 | AIR CONDITION ONLY SPACE NECESSARY | $3,598 | $6,724 | Not Implemented |
UF0578 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,461 | $390 | Implemented |
UF0578 # 01 Y:2022 | 01 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $15,842 | $11,742 | Implemented |
UF0578 # 02 Y:2022 | 02 | 2022 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $12,457 | $4,590 | Not Implemented |
UF0578 # 07 Y:2022 | 07 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,930 | $0 | Implemented |
UF0578 # 03 Y:2022 | 03 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,829 | $2,419 | Implemented |
UF0578 # 08 Y:2022 | 08 | 2022 | INSTALL OCCUPANCY SENSORS | $1,065 | $1,710 | Implemented |
UF0578 # 05 Y:2022 | 05 | 2022 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $7,688 | $0 | Implemented |
UF0578 # 04 Y:2022 | 04 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,565 | $25,400 | Not Implemented |
UF0572 # 08 Y:2022 | 08 | 2022 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $5,635 | $4,650 | Implemented |
UF0572 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $56,857 | $359,360 | Implemented |
UF0572 # 02 Y:2022 | 02 | 2022 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $27,950 | $26,859 | Implemented |
UF0572 # 03 Y:2022 | 03 | 2022 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $4,159 | $10,627 | Implemented |
UF0572 # 04 Y:2022 | 04 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,152 | $3,218 | Implemented |
UF0572 # 05 Y:2022 | 05 | 2022 | INSTALL OCCUPANCY SENSORS | $4,007 | $8,760 | Implemented |
UF0572 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,414 | $756 | Implemented |
UF0572 # 07 Y:2022 | 07 | 2022 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $12,245 | $11,975 | Implemented |
MI0394 # 02 Y:2021 | 02 | 2021 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $12,537 | $1,380 | Not Implemented |
MI0394 # 01 Y:2021 | 01 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $24,463 | $480 | Implemented |
MI0394 # 03 Y:2021 | 03 | 2021 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $9,170 | $2,549 | Not Implemented |
MI0394 # 08 Y:2021 | 08 | 2021 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,367 | $2,549 | Implemented |
MI0394 # 05 Y:2021 | 05 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,836 | $2,100 | Not Implemented |
MI0394 # 06 Y:2021 | 06 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,427 | $1,980 | Implemented |
MI0394 # 04 Y:2021 | 04 | 2021 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $4,060 | $14,609 | Not Implemented |
MI0394 # 07 Y:2021 | 07 | 2021 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $2,040 | $616 | Not Implemented |