IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0414 # 02 Y:2008 02 2008 REDUCE DELIVERY SCHEDULES $89,700 $6,652 Not Implemented
UF0414 # 03 Y:2008 03 2008 OPTIMIZE PLANT POWER FACTOR $44,500 $13,000 Implemented
UF0414 # 04 Y:2008 04 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,808 $15,562 Implemented
UF0414 # 05 Y:2008 05 2008 INSTALL OCCUPANCY SENSORS $255 $39 Implemented
UF0414 # 06 Y:2008 06 2008 REPAIR AND ELIMINATE STEAM LEAKS $2,447 $371 Implemented
UF0414 # 07 Y:2008 07 2008 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $13,994 $10,000 Not Implemented
UF0414 # 08 Y:2008 08 2008 BURN A LESS EXPENSIVE GRADE OF FUEL $217,282 $100,000 Not Implemented
UF0414 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,527 $7,379 Implemented
UF0412 # 06 Y:2008 06 2008 DEVELOP A REPAIR/REPLACE POLICY $2,521 $0 Implemented
UF0412 # 11 Y:2008 11 2008 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $9,359 $4,246 Implemented
UF0412 # 10 Y:2008 10 2008 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $95,676 $20,000 Not Implemented
UF0412 # 09 Y:2008 09 2008 CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS $1,822 $10,480 Implemented
UF0412 # 08 Y:2008 08 2008 INSTALL SET-BACK TIMERS $15,103 $4,916 Implemented
UF0412 # 07 Y:2008 07 2008 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $2,081 $534 Not Implemented
UF0412 # 05 Y:2008 05 2008 REPAIR AND ELIMINATE STEAM LEAKS $17,781 $615 Implemented
UF0412 # 04 Y:2008 04 2008 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,855 $795 Not Implemented
UF0412 # 03 Y:2008 03 2008 UPGRADE CONTROLS ON COMPRESSORS $12,505 $731 Implemented
UF0412 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,683 $42,414 Implemented
UF0412 # 01 Y:2008 01 2008 INSTALL OCCUPANCY SENSORS $207 $79 Not Implemented
UF0407 # 01 Y:2008 01 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $72,878 $27,259 Not Implemented
UF0407 # 02 Y:2008 02 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,924 $9,726 Implemented
UF0407 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,672 $762 Implemented
UF0407 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,409 $0 Implemented
UF0407 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $156,184 $102,044 Not Implemented
UF0407 # 06 Y:2008 06 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,021 $0 Implemented