IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

256

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0418 # 11 Y:2008 11 2008 INSTALL OCCUPANCY SENSORS $5,889 $6,806 Implemented
UF0418 # 09 Y:2008 09 2008 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $7,856 $809 Implemented
UF0418 # 08 Y:2008 08 2008 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $39,146 $1,589 Implemented
UF0418 # 07 Y:2008 07 2008 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $3,791 $0 Implemented
UF0418 # 05 Y:2008 05 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,900 $800 Implemented
UF0418 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,047 $1,060 Implemented
UF0418 # 02 Y:2008 02 2008 INSTALL COMMON HEADER ON COMPRESSORS $4,076 $2,560 Implemented
UF0415 # 07 Y:2008 07 2008 DEVELOP A REPAIR/REPLACE POLICY $648 $0 Implemented
UF0415 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $666 $0 Implemented
UF0415 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,736 $30,084 Implemented
MI0165 # 05 Y:2008 05 2008 INSULATE BARE EQUIPMENT $4,023 $1,957 Implemented
MI0165 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,496 $40 Implemented
MI0165 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,875 $1,210 Implemented
MI0165 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,654 $41,800 Implemented
MI0156 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,688 $1,074 Implemented
MI0156 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,033 $30 Implemented
MI0156 # 02 Y:2007 02 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,674 $1,232 Implemented
UF0404 # 06 Y:2007 06 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,133 $15,174 Implemented
UF0404 # 08 Y:2007 08 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $28,000 $270 Implemented
UF0404 # 01 Y:2007 01 2007 USE OPTIMUM THICKNESS INSULATION $45,739 $1,287 Implemented
UF0404 # 02 Y:2007 02 2007 USE OPTIMUM THICKNESS INSULATION $10,863 $369 Implemented
UF0404 # 07 Y:2007 07 2007 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,571 $15,174 Implemented
UF0404 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $603 $230 Implemented
MI0140 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,834 $1,074 Implemented
MI0140 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,875 $30 Implemented