IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

468

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0428 # 09 Y:2009 09 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $25,086 $0 Implemented
MI0168 # 01 Y:2008 01 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $256,906 $645,000 Not Implemented
MI0168 # 02 Y:2008 02 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $60,893 $2,040 Implemented
MI0168 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,290 $43,681 Implemented
MI0168 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,060 $1,210 Implemented
MI0168 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,713 $40 Implemented
MI0168 # 06 Y:2008 06 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,677 $3,475 Not Implemented
MI0168 # 07 Y:2008 07 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $33,795 $22,516 Implemented
MI0168 # 08 Y:2008 08 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $22,202 $3,320 Implemented
MI0166 # 01 Y:2008 01 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $360,093 $695,000 Not Implemented
MI0166 # 02 Y:2008 02 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $70,996 $1,200 Implemented
MI0166 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,899 $41,800 Implemented
MI0166 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,060 $1,210 Implemented
MI0166 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,713 $40 Implemented
MI0166 # 06 Y:2008 06 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,677 $3,475 Not Implemented
UF0410 # 01 Y:2008 01 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $23,868 $27,216 Not Implemented
UF0410 # 02 Y:2008 02 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,023 $19,505 Not Implemented
UF0410 # 03 Y:2008 03 2008 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,665 $459 Implemented
UF0410 # 04 Y:2008 04 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,229 $233 Implemented
UF0410 # 05 Y:2008 05 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,494 $0 Implemented
UF0410 # 06 Y:2008 06 2008 INSTALL OCCUPANCY SENSORS $4,311 $122 Not Implemented
UF0410 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $136,962 $129,516 Not Implemented
UF0410 # 08 Y:2008 08 2008 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,174 $2,995 Not Implemented
MI0150 # 01 Y:2007 01 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $42,022 $5,254 Not Implemented
MI0150 # 02 Y:2007 02 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $41,941 $120 Not Implemented