IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

69

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0569 # 09 Y:2021 09 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,071 $495 Implemented
MI0391 # 06 Y:2021 06 2021 INSTALL OCCUPANCY SENSORS $3,068 $1,728 Implemented
MI0391 # 04 Y:2021 04 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,293 $2,100 Implemented
MI0391 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,882 $1,980 Implemented
MI0390 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,676 $3,477 Implemented
MI0390 # 01 Y:2021 01 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,273 $1,040 Implemented
UF0568 # 09 Y:2021 09 2021 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $3,655 $0 Implemented
UF0568 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $3,117 $9,240 Implemented
UF0568 # 03 Y:2021 03 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,182 $12,247 Implemented
UF0568 # 02 Y:2021 02 2021 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $20,147 $49,165 Implemented
UF0567 # 01 Y:2021 01 2021 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $123,727 $246,613 Implemented
UF0567 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $95,985 $228,343 Implemented
UF0567 # 04 Y:2021 04 2021 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $9,372 $14,250 Implemented
UF0567 # 08 Y:2021 08 2021 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $5,867 $0 Implemented
UF0567 # 03 Y:2021 03 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $42,803 $42,764 Implemented
UF0566 # 07 Y:2021 07 2021 MINIMIZE WATER USAGE $1,899 $0 Implemented
UF0566 # 08 Y:2021 08 2021 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $1,187 $0 Implemented
UF0566 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,527 $41,169 Implemented
UF0566 # 03 Y:2021 03 2021 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $5,976 $16,642 Implemented
UF0566 # 04 Y:2021 04 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,332 $0 Implemented
MI0389 # 09 Y:2021 09 2021 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,362 $616 Implemented
MI0389 # 08 Y:2021 08 2021 USE COMPRESSOR AIR FILTERS $1,420 $1,100 Implemented
MI0389 # 05 Y:2021 05 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $19,025 $120 Implemented
MI0389 # 04 Y:2021 04 2021 INSTALL EFFICIENT RECTIFIERS $21,196 $55,920 Implemented
MI0389 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,739 $33,655 Implemented