IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

317

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0392 # 02 Y:2006 02 2006 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $28,316 $138,000 Not Implemented
UF0392 # 05 Y:2006 05 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $535 $486 Not Implemented
UF0392 # 03 Y:2006 03 2006 INSTALL OCCUPANCY SENSORS $238 $228 Not Implemented
UF0392 # 01 Y:2006 01 2006 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $32,112 $2,775 Implemented
UF0392 # 07 Y:2006 07 2006 USE OPTIMUM THICKNESS INSULATION $2,922 $1,680 Not Implemented
UF0392 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,311 $8,824 Implemented
UF0392 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,532 $585 Implemented
MI0141 # 04 Y:2006 04 2006 AIR CONDITION ONLY SPACE NECESSARY $2,681 $160 Not Implemented
MI0141 # 05 Y:2006 05 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,825 $2,460 Not Implemented
MI0141 # 02 Y:2006 02 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,232 $200 Not Implemented
MI0141 # 03 Y:2006 03 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $6,036 $0 Not Implemented
MI0141 # 01 Y:2006 01 2006 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $20,786 $36,000 Not Implemented
MI0140 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,834 $1,074 Implemented
MI0140 # 04 Y:2006 04 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,195 $940 Implemented
MI0140 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,875 $30 Implemented
MI0140 # 05 Y:2006 05 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,523 $6,267 Not Implemented
MI0140 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,779 $41,070 Not Implemented
MI0139 # 05 Y:2006 05 2006 RECOVER WASTE HEAT FROM EQUIPMENT $3,192 $5,000 Implemented
MI0139 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $26,909 $30 Implemented
MI0139 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,014 $50,232 Not Implemented
MI0139 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $36,785 $1,074 Implemented
MI0139 # 04 Y:2006 04 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,787 $40,200 Not Implemented
MI0138 # 05 Y:2006 05 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $18,750 $4,708 Not Implemented
MI0138 # 06 Y:2006 06 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,001 $9,540 Not Implemented
MI0138 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $38,928 $1,074 Implemented