IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

359

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0027 # 04 Y:2002 04 2002 RECYCLE WHITE WATER $2,639 $982 Not Implemented
MI0027 # 05 Y:2002 05 2002 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,727 $1,250 Not Implemented
UF0290 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,693 $20,165 Not Implemented
UF0290 # 02 Y:2002 02 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $35,297 $71,595 Not Implemented
UF0290 # 03 Y:2002 03 2002 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $864,295 $3,600,000 Not Implemented
UF0290 # 04 Y:2002 04 2002 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $18,405 $33,700 Not Implemented
UF0290 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,807 $0 Not Implemented
UF0290 # 06 Y:2002 06 2002 USE OPTIMUM TEMPERATURE $234,181 $2,080 Not Implemented
UF0290 # 07 Y:2002 07 2002 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $3,259 $1,633 Not Implemented
UF0290 # 08 Y:2002 08 2002 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,947 $2,300 Not Implemented
UF0290 # 09 Y:2002 09 2002 USE TANKS WITH A CONICAL BOTTOM OUTLET SECTION TO REDUCE WASTE ASSOCIATED WITH THE INTERFACE OF TWO LIQUIDS $17,094 $0 Not Implemented
UF0290 # 10 Y:2002 10 2002 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $174,200 $0 Not Implemented
UF0290 # 11 Y:2002 11 2002 $138,643 $29,000 Not Implemented
MI0026 # 01 Y:2002 01 2002 $26,325 $45,000 Not Implemented
MI0026 # 02 Y:2002 02 2002 $23,625 $714 Implemented
MI0026 # 03 Y:2002 03 2002 $16,250 $60 Implemented
MI0026 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,497 $60 Implemented
MI0026 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $160 $2 Implemented
UF0293 # 01 Y:2002 01 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $20,692 $12,162 n/a
UF0293 # 02 Y:2002 02 2002 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $24,940 $30,000 n/a
UF0293 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,684 $23,130 n/a
UF0293 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,852 $550 n/a
UF0293 # 05 Y:2002 05 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,029 $3,500 n/a
UF0293 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,444 $4,753 n/a
UF0293 # 07 Y:2002 07 2002 MOVE BOILER TO MORE EFFICIENT LOCATION $1,449 $0 n/a