Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsNAICS | 3114 | Fruit and Vegetable Preserving and Specialty Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0211 # 09 Y:2011 | 09 | 2011 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,438 | $4,571 | Implemented |
MI0211 # 08 Y:2011 | 08 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,475 | $1,720 | Not Implemented |
MI0211 # 07 Y:2011 | 07 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,618 | $50 | Implemented |
MI0211 # 06 Y:2011 | 06 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,771 | $1,950 | Implemented |
MI0211 # 05 Y:2011 | 05 | 2011 | HEAT WATER WITH EXHAUST HEAT | $16,479 | $30,000 | Not Implemented |
MI0211 # 04 Y:2011 | 04 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,111 | $1,320 | Implemented |
MI0211 # 03 Y:2011 | 03 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $24,390 | $25,000 | Not Implemented |
MI0211 # 02 Y:2011 | 02 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,191 | $41,400 | Implemented |
MI0211 # 01 Y:2011 | 01 | 2011 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $25,532 | $213,119 | Implemented |
MI0210 # 02 Y:2011 | 02 | 2011 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $39,559 | $7,338 | Not Implemented |
MI0210 # 12 Y:2011 | 12 | 2011 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,455 | $2,425 | Implemented |
MI0210 # 11 Y:2011 | 11 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,145 | $8,889 | Implemented |
MI0210 # 10 Y:2011 | 10 | 2011 | USE RADIANT HEATER FOR SPOT HEATING | $8,346 | $10,000 | Implemented |
MI0210 # 09 Y:2011 | 09 | 2011 | HEAT WATER WITH EXHAUST HEAT | $16,131 | $30,000 | Not Implemented |
MI0210 # 08 Y:2011 | 08 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $16,463 | $16,554 | Not Implemented |
MI0210 # 07 Y:2011 | 07 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $17,851 | $20,000 | Not Implemented |
MI0210 # 06 Y:2011 | 06 | 2011 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $18,125 | $133,000 | Implemented |
MI0210 # 05 Y:2011 | 05 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $18,730 | $26,000 | Implemented |
MI0210 # 04 Y:2011 | 04 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $20,342 | $1,350 | Not Implemented |
MI0210 # 03 Y:2011 | 03 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,805 | $1,320 | Implemented |
MI0210 # 01 Y:2011 | 01 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $64,568 | $175,700 | Not Implemented |
MI0209 # 01 Y:2011 | 01 | 2011 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $4,297,734 | $3,000,000 | Implemented |
MI0209 # 02 Y:2011 | 02 | 2011 | HEAT WATER WITH EXHAUST HEAT | $240,185 | $30,000 | Not Implemented |
MI0209 # 03 Y:2011 | 03 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $192,436 | $36,000 | Not Implemented |
MI0209 # 04 Y:2011 | 04 | 2011 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $132,137 | $500,000 | Implemented |