IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

208

matching recommendations
Reset
NAICS 3391 Medical Equipment and Supplies Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0434 # 05 Y:2010 05 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $18,101 $4,865 Not Implemented
UF0434 # 06 Y:2010 06 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,388 $0 Not Implemented
UF0434 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $1,414 $1,926 Not Implemented
UF0434 # 08 Y:2010 08 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,980 $881 Not Implemented
UF0434 # 09 Y:2010 09 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,310 $20,000 Not Implemented
UF0434 # 10 Y:2010 10 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,649 $232 Not Implemented
UF0434 # 11 Y:2010 11 2010 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,515 $7,701 Not Implemented
UF0434 # 12 Y:2010 12 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,125 $2,284 Not Implemented
UF0434 # 13 Y:2010 13 2010 CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS $1,875 $10,480 Not Implemented
UF0434 # 14 Y:2010 14 2010 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $11,568 $0 Not Implemented
UF0434 # 15 Y:2010 15 2010 RECYCLE FLUORESCENT LAMPS $571 $3,405 Not Implemented
UF0419 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $36,890 $904 Not Implemented
UF0419 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $2,358 $0 Not Implemented
UF0419 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,291 $0 Not Implemented
UF0419 # 04 Y:2009 04 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $490 $0 Not Implemented
UF0419 # 05 Y:2009 05 2009 OPTIMIZE PLANT POWER FACTOR $2,671 $3,405 Not Implemented
UF0419 # 06 Y:2009 06 2009 INSTALL OCCUPANCY SENSORS $32,995 $9,325 Not Implemented
UF0419 # 07 Y:2009 07 2009 INSULATE BARE EQUIPMENT $112,051 $1,026 Not Implemented
UF0419 # 08 Y:2009 08 2009 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $107,292 $42,500 Not Implemented
UF0419 # 09 Y:2009 09 2009 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $41,483 $4,000 Not Implemented
UF0419 # 10 Y:2009 10 2009 SEPARATE TREATMENTS FOR EACH TYPE OF SOLUTION AND RECYCLE $2,671 $3,405 Not Implemented
MI0119 # 01 Y:2005 01 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,064 $170 Implemented
MI0119 # 02 Y:2005 02 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,450 $96 Implemented
MI0119 # 03 Y:2005 03 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,432 $100 Not Implemented
MI0119 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,973 $862 Implemented