Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
77
matching recommendationsNAICS | 339113 | Surgical Appliance and Supplies Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0336 # 07 Y:2018 | 07 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $2,620 | $3,230 | Not Implemented |
MI0336 # 09 Y:2018 | 09 | 2018 | INSTALL OCCUPANCY SENSORS | $492 | $1,466 | Implemented |
MI0336 # 06 Y:2018 | 06 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,709 | $2,800 | Implemented |
MI0336 # 05 Y:2018 | 05 | 2018 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $4,515 | $626 | Not Implemented |
MI0336 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,664 | $11,634 | Implemented |
MI0336 # 03 Y:2018 | 03 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $17,738 | $3,280 | Implemented |
MI0336 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,939 | $48,821 | Implemented |
MI0336 # 01 Y:2018 | 01 | 2018 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $21,620 | $80 | Implemented |
MI0336 # 08 Y:2018 | 08 | 2018 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,516 | $661 | Not Implemented |
MI0241 # 09 Y:2013 | 09 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,593 | $1,660 | Implemented |
MI0241 # 01 Y:2013 | 01 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $16,509 | $3,900 | Implemented |
MI0241 # 02 Y:2013 | 02 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,217 | $6,000 | Implemented |
MI0241 # 03 Y:2013 | 03 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $9,040 | $80 | Implemented |
MI0241 # 04 Y:2013 | 04 | 2013 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $7,960 | $540 | Implemented |
MI0241 # 05 Y:2013 | 05 | 2013 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,883 | $4,691 | Implemented |
MI0241 # 06 Y:2013 | 06 | 2013 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,564 | $440 | Implemented |
MI0241 # 07 Y:2013 | 07 | 2013 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,118 | $5,397 | Not Implemented |
MI0241 # 08 Y:2013 | 08 | 2013 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,942 | $2,196 | Implemented |
MI0241 # 10 Y:2013 | 10 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $955 | $80 | Not Implemented |
MI0241 # 11 Y:2013 | 11 | 2013 | INSULATE BARE EQUIPMENT | $686 | $1,520 | Implemented |
MI0241 # 12 Y:2013 | 12 | 2013 | INSTALL OCCUPANCY SENSORS | $542 | $209 | Not Implemented |
UF0436 # 08 Y:2010 | 08 | 2010 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $19,232 | $26,795 | Implemented |
UF0436 # 09 Y:2010 | 09 | 2010 | DEVELOP A REPAIR/REPLACE POLICY | $29,576 | $10,400 | Not Implemented |
UF0436 # 04 Y:2010 | 04 | 2010 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $13,947 | $350 | Implemented |
UF0436 # 03 Y:2010 | 03 | 2010 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $27,623 | $20,280 | Not Implemented |