Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27
matching recommendationsSIC | 22 | Textile Mill Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0792 # 02 Y:2004 | 02 | 2004 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $19,495 | $3,060 | Implemented |
GT0792 # 03 Y:2004 | 03 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,050 | $616 | Implemented |
GT0792 # 04 Y:2004 | 04 | 2004 | REPAIR OR REPLACE STEAM TRAPS | $9,228 | $11,000 | Implemented |
GT0792 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,100 | $75,700 | Not Implemented |
GT0792 # 06 Y:2004 | 06 | 2004 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $41,148 | $96,250 | Not Implemented |
GT0792 # 07 Y:2004 | 07 | 2004 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $5,310 | $8,000 | Not Implemented |
GT0792 # 08 Y:2004 | 08 | 2004 | CONTROL PRESSURE ON STEAMER OPERATIONS | $39,600 | $32,100 | Not Implemented |
GT0792 # 01 Y:2004 | 01 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $21,335 | $10,000 | Implemented |
GT0777 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,878 | $81,651 | n/a |
GT0777 # 06 Y:2004 | 06 | 2004 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,122 | $2,320 | Implemented |
GT0777 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,910 | $1,000 | Implemented |
GT0777 # 04 Y:2004 | 04 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,122 | $10,970 | Implemented |
GT0777 # 03 Y:2004 | 03 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,295 | $1,400 | Implemented |
GT0777 # 02 Y:2004 | 02 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $14,877 | $800 | Implemented |
GT0777 # 01 Y:2004 | 01 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,136 | $0 | Implemented |
GT0777 # 08 Y:2004 | 08 | 2004 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $13,327 | $20,670 | n/a |
GT0776 # 09 Y:2004 | 09 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,188 | $32,362 | n/a |
GT0776 # 10 Y:2004 | 10 | 2004 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $9,120 | $16,200 | n/a |
GT0776 # 08 Y:2004 | 08 | 2004 | REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE | $37,139 | $76,240 | n/a |
GT0776 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $51,823 | $73,750 | n/a |
GT0776 # 06 Y:2004 | 06 | 2004 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $649 | $530 | n/a |
GT0776 # 05 Y:2004 | 05 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $11,980 | $13,020 | n/a |
GT0776 # 04 Y:2004 | 04 | 2004 | IMPROVE LUBRICATION PRACTICES | $14,283 | $0 | n/a |
GT0776 # 03 Y:2004 | 03 | 2004 | INSULATE BARE EQUIPMENT | $330 | $83 | n/a |
GT0776 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,581 | $550 | n/a |