IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

155

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0508 # 09 Y:2013 09 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $3,758 $976 Implemented
IA0508 # 08 Y:2013 08 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,512 $1,000 Implemented
IA0508 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $598 $394 Not Implemented
IA0508 # 06 Y:2013 06 2013 INSTALL OCCUPANCY SENSORS $6,734 $5,775 Not Implemented
IA0508 # 05 Y:2013 05 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $689 $1,590 Implemented
IA0508 # 04 Y:2013 04 2013 OPTIMIZE PLANT POWER FACTOR $6,113 $6,000 Implemented
IA0508 # 03 Y:2013 03 2013 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,845 $1,000 Implemented
IA0508 # 02 Y:2013 02 2013 REPAIR OR REPLACE STEAM TRAPS $14,349 $3,750 Implemented
IA0508 # 01 Y:2013 01 2013 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $218,077 $1,045,200 Not Implemented
IA0477 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,752 $52,500 Implemented
IA0477 # 02 Y:2012 02 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,202 $609 Not Implemented
IA0477 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $436 $719 Not Implemented
IA0477 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,175 $5,087 Not Implemented
IA0477 # 05 Y:2012 05 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,536 $18 Not Implemented
IA0477 # 06 Y:2012 06 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,869 $206 Not Implemented
IA0477 # 07 Y:2012 07 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,407 $630 Not Implemented
IA0477 # 08 Y:2012 08 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $431 $153 Not Implemented
IA0477 # 09 Y:2012 09 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $762 $3,574 Not Implemented
IA0449 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,181 $650 Implemented
IA0449 # 07 Y:2010 07 2010 COVER OPEN TANKS $8,215 $6,350 Not Implemented
IA0449 # 06 Y:2010 06 2010 INSULATE BARE EQUIPMENT $5,734 $1,910 Implemented
IA0449 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $229 $1,199 Implemented
IA0449 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,171 $500 Implemented
IA0449 # 01 Y:2010 01 2010 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $13,384 $500 Not Implemented
IA0449 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,025 $28,980 Implemented