Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
175
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0232 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,087 | $445 | Not Implemented |
IA0232 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,827 | $537 | Implemented |
IA0232 # 05 Y:1999 | 05 | 1999 | CONVERT TO ELECTROSTATIC POWDER COATING | $150,000 | $28,000 | Not Implemented |
IA0232 # 04 Y:1999 | 04 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $704 | $828 | Not Implemented |
IA0232 # 06 Y:1999 | 06 | 1999 | RECYCLE CLEANING SOLVENT AND REUSE | $33,891 | $10,300 | Implemented |
IA0232 # 08 Y:1999 | 08 | 1999 | MOVE PRODUCT USING MECHANICAL MEANS | $31,898 | $175,500 | Not Implemented |
IA0232 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,704 | $13,064 | Not Implemented |
IA0232 # 07 Y:1999 | 07 | 1999 | CLOSELY MONITOR CHEMICAL ADDITIONS TO INCREASE BATH LIFE | $9,540 | $16,088 | Not Implemented |
IA0237 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,914 | $8,729 | Not Implemented |
IA0237 # 05 Y:1999 | 05 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,891 | $0 | Not Implemented |
IA0237 # 01 Y:1999 | 01 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,880 | $1,142 | Not Implemented |
IA0237 # 07 Y:1999 | 07 | 1999 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $7,704 | $10,300 | Not Implemented |
IA0237 # 06 Y:1999 | 06 | 1999 | INSTALL OCCUPANCY SENSORS | $247 | $466 | Not Implemented |
IA0237 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,447 | $264 | Not Implemented |
IA0237 # 08 Y:1999 | 08 | 1999 | INSTALL SYSTEM TO COLLECT SCRAP | $47,034 | $3,932 | Not Implemented |
IA0237 # 02 Y:1999 | 02 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,608 | $945 | Not Implemented |
IA0227 # 14 Y:1999 | 14 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $150,880 | $154,000 | n/a |
IA0227 # 07 Y:1999 | 07 | 1999 | INSTALL OCCUPANCY SENSORS | $5,561 | $1,330 | n/a |
IA0227 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $25,100 | $150 | n/a |
IA0227 # 05 Y:1999 | 05 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,875 | $0 | n/a |
IA0227 # 09 Y:1999 | 09 | 1999 | MAINTAIN MACHINES TO REDUCE LEAKS | $5,867 | $3,906 | n/a |
IA0227 # 04 Y:1999 | 04 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $72,026 | $0 | n/a |
IA0227 # 16 Y:1999 | 16 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $75,440 | $150,000 | n/a |
IA0227 # 01 Y:1999 | 01 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $825,660 | $1,863 | n/a |
IA0227 # 08 Y:1999 | 08 | 1999 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $6,074 | $3,038 | n/a |