Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
28
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0056 # 06 Y:2003 | 06 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $110 | $490 | Implemented |
UU0056 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $190 | $266 | Not Implemented |
UU0056 # 04 Y:2003 | 04 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $223 | $136 | Not Implemented |
UU0056 # 03 Y:2003 | 03 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $244 | $58 | Implemented |
UU0056 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $325 | $121 | Implemented |
UU0056 # 01 Y:2003 | 01 | 2003 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $335 | $1,600 | Not Implemented |
UU0055 # 07 Y:2003 | 07 | 2003 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $12,956 | $21,000 | Not Implemented |
UU0055 # 06 Y:2003 | 06 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,273 | $7,500 | Not Implemented |
UU0055 # 05 Y:2003 | 05 | 2003 | USE HEAT PUMP FOR SPACE CONDITIONING | $2,492 | $39,000 | Not Implemented |
UU0055 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $889 | $349 | Not Implemented |
UU0055 # 03 Y:2003 | 03 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $430 | $1,870 | Not Implemented |
UU0055 # 02 Y:2003 | 02 | 2003 | ADD AREA LIGHTING SWITCHES | $659 | $500 | Not Implemented |
UU0055 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $710 | $710 | Not Implemented |
OR0440 # 07 Y:2003 | 07 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $15,500 | $38,200 | Implemented |
OR0440 # 06 Y:2003 | 06 | 2003 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $765 | $1,300 | Not Implemented |
OR0440 # 05 Y:2003 | 05 | 2003 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $2,600 | $700 | Implemented |
OR0440 # 04 Y:2003 | 04 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,500 | $0 | Not Implemented |
OR0440 # 03 Y:2003 | 03 | 2003 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $16,500 | $5,130 | Implemented |
OR0440 # 02 Y:2003 | 02 | 2003 | MOVE PRODUCT USING MECHANICAL MEANS | $15,000 | $75 | Not Implemented |
OR0440 # 01 Y:2003 | 01 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $1,842,800 | $348,000 | Implemented |
OR0439 # 01 Y:2003 | 01 | 2003 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $330,000 | $790,000 | Implemented |
OR0439 # 08 Y:2003 | 08 | 2003 | UPGRADE CONTROLS ON COMPRESSORS | $1,260 | $495 | Not Implemented |
OR0439 # 07 Y:2003 | 07 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,940 | $1,850 | Not Implemented |
OR0439 # 06 Y:2003 | 06 | 2003 | OPTIMIZE OPERATION OF MULTI-STAGE VACUUM STEAM JETS | $3,250 | $3,000 | Implemented |
OR0439 # 05 Y:2003 | 05 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,400 | $12,100 | Implemented |