IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

235

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0331 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,434 $19,814 Not Implemented
BD0331 # 02 Y:2007 02 2007 INSTALL OCCUPANCY SENSORS $4,359 $2,026 Not Implemented
BD0331 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $524 $65 Not Implemented
BD0331 # 04 Y:2007 04 2007 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $11,450 $4,951 Implemented
BD0331 # 05 Y:2007 05 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,820 $301 Not Implemented
BD0331 # 06 Y:2007 06 2007 RECOVER WASTE HEAT FROM EQUIPMENT $321 $2 Not Implemented
BD0331 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $841 $2 Not Implemented
BD0331 # 08 Y:2007 08 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,672 $7,701 Not Implemented
BD0331 # 09 Y:2007 09 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,486 $26,401 Not Implemented
BD0331 # 10 Y:2007 10 2007 $9,311 $301 Not Implemented
BD0331 # 11 Y:2007 11 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $53,878 $20,001 Not Implemented
IC0112 # 01 Y:2006 01 2006 REPLACE BOILER $300,562 $414,240 Not Implemented
IC0112 # 02 Y:2006 02 2006 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $57,168 $11,016 Implemented
IC0112 # 03 Y:2006 03 2006 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $44,296 $145,126 Implemented
IC0112 # 04 Y:2006 04 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $42,495 $66,129 Not Implemented
IC0112 # 05 Y:2006 05 2006 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $28,585 $165,480 Not Implemented
IC0112 # 06 Y:2006 06 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $48,787 $157,465 Implemented
IC0112 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,753 $2,300 Implemented
IC0112 # 08 Y:2006 08 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,114 $0 Implemented
IC0111 # 01 Y:2006 01 2006 REPLACE STEAM JETS ON VACUUM SYSTEM WITH ELECTRIC MOTOR DRIVEN VACUUM PUMPS $803,012 $258,000 Implemented
IC0111 # 02 Y:2006 02 2006 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $95,000 $442,680 Not Implemented
IC0111 # 03 Y:2006 03 2006 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $186,788 $135,156 Not Implemented
IC0111 # 04 Y:2006 04 2006 INCREASE AMOUNT OF CONDENSATE RETURNED $93,000 $235,998 Implemented
IC0111 # 05 Y:2006 05 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,047 $30,000 Not Implemented
IC0111 # 06 Y:2006 06 2006 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $57,000 $36,000 Not Implemented