IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

434

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0085 # 07 Y:2004 07 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $33,640 $138,438 Implemented
IC0085 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $2,016 $5,841 Not Implemented
IC0085 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,714 $11,153 Not Implemented
IC0066 # 01 Y:2003 01 2003 INSTALL OCCUPANCY SENSORS $5,571 $8,423 n/a
IC0066 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,454 $19,501 n/a
IC0066 # 03 Y:2003 03 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $16,576 $2,920 n/a
IC0066 # 04 Y:2003 04 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $43,869 $12,078 n/a
IC0066 # 05 Y:2003 05 2003 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $13,337 $39,718 n/a
IC0066 # 06 Y:2003 06 2003 INSTALL SET-BACK TIMERS $98,862 $75,187 n/a
IC0066 # 07 Y:2003 07 2003 INSTALL TIMERS AND/OR THERMOSTATS $1,972 $3,710 n/a
IC0066 # 08 Y:2003 08 2003 RECOVER WASTE HEAT FROM EQUIPMENT $7,849 $14,148 n/a
IC0066 # 09 Y:2003 09 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $18,071 $78,893 n/a
IC0043 # 01 Y:2002 01 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $700 $578 Implemented
IC0043 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,789 $81,125 Implemented
IC0043 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $117 $1,822 Implemented
IC0043 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $705 $783 Not Implemented
IC0043 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $965 $1,169 Implemented
IC0043 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,481 $3,120 Implemented
IC0043 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,358 $26,100 Implemented
IC0043 # 08 Y:2002 08 2002 $98,945 $37,525 Not Implemented
BD0213 # 01 Y:2002 01 2002 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS $40,151 $138,000 Not Implemented
BD0213 # 02 Y:2002 02 2002 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $29,490 $10,000 Implemented
BD0213 # 03 Y:2002 03 2002 INSTALL AUTOMATIC STACK DAMPER $12,416 $15,000 Not Implemented
BD0213 # 04 Y:2002 04 2002 INSTALL TURBULATORS $3,780 $2,194 Not Implemented
BD0213 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,926 $0 Implemented