IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0063 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,186 $100 Implemented
IA0063 # 04 Y:1993 04 1993 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,421 $685 Implemented
IA0063 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $402 $925 Implemented
IA0063 # 06 Y:1993 06 1993 USE RADIANT HEATER FOR SPOT HEATING $2,719 $10,200 Implemented
IA0063 # 09 Y:1993 09 1993 INSTALL OCCUPANCY SENSORS $473 $665 Implemented
IA0063 # 10 Y:1993 10 1993 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $556 $215 Implemented
IA0063 # 11 Y:1993 11 1993 INSTALL TIMERS AND/OR THERMOSTATS $595 $1,350 Implemented
IA0063 # 01 Y:1993 01 1993 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $21,047 $82,940 Implemented
MO0089 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,906 $8,802 Implemented
MO0089 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,680 $6,612 Implemented
MO0089 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,222 $480 Implemented
MO0089 # 01 Y:1993 01 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,558 $1,295 Implemented
MO0089 # 02 Y:1993 02 1993 INSULATE BARE EQUIPMENT $1,435 $624 Implemented
WI0179 # 07 Y:1993 07 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $625 $700 Implemented
WI0179 # 03 Y:1993 03 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,270 $0 Implemented
WI0174 # 02 Y:1993 02 1993 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,898 $0 Implemented
MO0076 # 06 Y:1993 06 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,141 $318 Implemented
MO0076 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,747 $4,462 Implemented
MO0076 # 03 Y:1993 03 1993 RECOVER WASTE HEAT FROM EQUIPMENT $4,492 $7,920 Implemented
MO0076 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,324 $3,981 Implemented
MO0076 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $718 $219 Implemented