IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

340

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0131 # 14 Y:2007 14 2007 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $956 $7,500 Not Implemented
IC0131 # 15 Y:2007 15 2007 MINIMIZE WATER USAGE $7,267 $15,000 Implemented
IC0131 # 16 Y:2007 16 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $32 $1 Implemented
IC0131 # 17 Y:2007 17 2007 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $5,723 $15,000 Implemented
IC0131 # 18 Y:2007 18 2007 $19,189 $38,378 Implemented
BD0319 # 01 Y:2007 01 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $21,538 $875 Implemented
BD0319 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $403 $475 Not Implemented
BD0319 # 03 Y:2007 03 2007 USE PHOTOCELL CONTROLS $328 $250 Not Implemented
BD0319 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,763 $0 Implemented
BD0319 # 05 Y:2007 05 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $876 $500 Not Implemented
BD0319 # 06 Y:2007 06 2007 MINIMIZE WATER USAGE $1,153 $2,800 Not Implemented
BD0309 # 01 Y:2006 01 2006 USE RADIANT HEATER FOR SPOT HEATING $23,664 $27,472 Not Implemented
BD0309 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,400 $1,800 Implemented
BD0309 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,190 $0 Implemented
BD0309 # 04 Y:2006 04 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $809 $1,000 Implemented
BD0309 # 05 Y:2006 05 2006 RECOVER WASTE HEAT FROM EQUIPMENT $7,023 $1,880 Implemented
BD0309 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $653 $1,200 Implemented
BD0309 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $309 $475 Implemented
BD0309 # 08 Y:2006 08 2006 RECOVER AND REUSE COOLING WATER $25,524 $60,000 Not Implemented
BD0309 # 09 Y:2006 09 2006 $54,288 $17,200 Not Implemented
BD0274 # 01 Y:2004 01 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,490 $24,000 Not Implemented
BD0274 # 02 Y:2004 02 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,379 $8,800 Implemented
BD0274 # 03 Y:2004 03 2004 USE RADIANT HEATER FOR SPOT HEATING $3,970 $3,000 Not Implemented
BD0274 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,012 $3,900 Implemented
BD0274 # 05 Y:2004 05 2004 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $2,571 $1,000 Implemented