Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
266
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0376 # 01 Y:2010 | 01 | 2010 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $105,011 | $51,500 | Implemented |
BD0376 # 04 Y:2010 | 04 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $39,238 | $34,000 | Implemented |
BD0376 # 03 Y:2010 | 03 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $62,913 | $70,000 | Implemented |
BD0376 # 08 Y:2010 | 08 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $989 | $1,727 | Implemented |
BD0376 # 06 Y:2010 | 06 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $11,590 | $5,500 | Implemented |
BD0376 # 05 Y:2010 | 05 | 2010 | INSTALL TURBULATORS | $20,378 | $4,350 | Not Implemented |
BD0376 # 02 Y:2010 | 02 | 2010 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $67,200 | $125 | Not Implemented |
BD0376 # 07 Y:2010 | 07 | 2010 | USE RADIANT HEATER FOR SPOT HEATING | $7,210 | $9,000 | Not Implemented |
UM0378 # 05 Y:2010 | 05 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $68,485 | $2,000 | Implemented |
UM0378 # 01 Y:2010 | 01 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,490 | $31,638 | Implemented |
UM0378 # 06 Y:2010 | 06 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,599 | $1,500 | Implemented |
UM0378 # 07 Y:2010 | 07 | 2010 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $3,345 | $7,800 | Implemented |
UM0378 # 03 Y:2010 | 03 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $755 | $1,000 | Implemented |
UM0378 # 04 Y:2010 | 04 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $102 | $10 | Not Implemented |
UM0378 # 02 Y:2010 | 02 | 2010 | UPGRADE CONTROLS ON COMPRESSORS | $2,693 | $3,996 | Implemented |
IC0179 # 05 Y:2010 | 05 | 2010 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $11,072 | $34,800 | Not Implemented |
IC0179 # 04 Y:2010 | 04 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,327 | $626 | Implemented |
IC0179 # 02 Y:2010 | 02 | 2010 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,268 | $0 | Not Implemented |
IC0179 # 06 Y:2010 | 06 | 2010 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $19,064 | $3,510 | Not Implemented |
IC0179 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $203 | $82 | Implemented |
IC0179 # 07 Y:2010 | 07 | 2010 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $357 | $0 | Not Implemented |
IC0179 # 03 Y:2010 | 03 | 2010 | INSTALL OCCUPANCY SENSORS | $389 | $2,833 | Implemented |
IC0178 # 05 Y:2010 | 05 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $754 | $4,000 | Implemented |
IC0178 # 10 Y:2010 | 10 | 2010 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $694 | $0 | Not Implemented |
IC0178 # 07 Y:2010 | 07 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,701 | $2,530 | Not Implemented |