Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
148
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0451 # 03 Y:2014 | 03 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $283 | $300 | Not Implemented |
MZ0160 # 08 Y:2014 | 08 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $13,300 | $5,000 | Implemented |
BD0451 # 06 Y:2014 | 06 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,193 | $500 | Not Implemented |
BD0451 # 04 Y:2014 | 04 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $10,440 | $17,300 | Not Implemented |
BD0451 # 05 Y:2014 | 05 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,993 | $590 | Not Implemented |
MZ0160 # 09 Y:2014 | 09 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $6,495 | $0 | Not Implemented |
BD0451 # 07 Y:2014 | 07 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,173 | $20 | Not Implemented |
MZ0160 # 06 Y:2014 | 06 | 2014 | ELIMINATE/REDUCE AN OPERATION | $7,727 | $0 | Not Implemented |
BD0451 # 02 Y:2014 | 02 | 2014 | INSTALL OCCUPANCY SENSORS | $6,245 | $825 | Not Implemented |
BD0451 # 09 Y:2014 | 09 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,993 | $875 | Not Implemented |
MZ0160 # 01 Y:2014 | 01 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,719 | $74,400 | Implemented |
MZ0160 # 07 Y:2014 | 07 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,778 | $7,000 | Not Implemented |
MZ0160 # 05 Y:2014 | 05 | 2014 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $13,436 | $24,000 | Not Implemented |
BD0451 # 08 Y:2014 | 08 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $783 | $100 | Not Implemented |
BD0451 # 13 Y:2014 | 13 | 2014 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $13,000 | $2,000 | Not Implemented |
MZ0160 # 10 Y:2014 | 10 | 2014 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $11,172 | $24,000 | Not Implemented |
MZ0160 # 03 Y:2014 | 03 | 2014 | REPLACE BOILER | $32,000 | $65,000 | Not Implemented |
MZ0160 # 04 Y:2014 | 04 | 2014 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $47,644 | $117,000 | Not Implemented |
BD0451 # 01 Y:2014 | 01 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,189 | $1,660 | Not Implemented |
BD0451 # 10 Y:2014 | 10 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,470 | $600 | Not Implemented |
BD0451 # 12 Y:2014 | 12 | 2014 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $364 | $20 | Not Implemented |
BD0451 # 11 Y:2014 | 11 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,720 | $560 | Not Implemented |
MZ0160 # 02 Y:2014 | 02 | 2014 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,000 | $15,000 | Not Implemented |
BD0450 # 10 Y:2014 | 10 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $322 | $143 | Not Implemented |
BD0450 # 09 Y:2014 | 09 | 2014 | INSTALL OCCUPANCY SENSORS | $406 | $750 | Not Implemented |