IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

148

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0451 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $283 $300 Not Implemented
MZ0160 # 08 Y:2014 08 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $13,300 $5,000 Implemented
BD0451 # 06 Y:2014 06 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,193 $500 Not Implemented
BD0451 # 04 Y:2014 04 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,440 $17,300 Not Implemented
BD0451 # 05 Y:2014 05 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,993 $590 Not Implemented
MZ0160 # 09 Y:2014 09 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,495 $0 Not Implemented
BD0451 # 07 Y:2014 07 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,173 $20 Not Implemented
MZ0160 # 06 Y:2014 06 2014 ELIMINATE/REDUCE AN OPERATION $7,727 $0 Not Implemented
BD0451 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $6,245 $825 Not Implemented
BD0451 # 09 Y:2014 09 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,993 $875 Not Implemented
MZ0160 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,719 $74,400 Implemented
MZ0160 # 07 Y:2014 07 2014 RECOVER WASTE HEAT FROM EQUIPMENT $3,778 $7,000 Not Implemented
MZ0160 # 05 Y:2014 05 2014 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $13,436 $24,000 Not Implemented
BD0451 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $783 $100 Not Implemented
BD0451 # 13 Y:2014 13 2014 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $13,000 $2,000 Not Implemented
MZ0160 # 10 Y:2014 10 2014 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $11,172 $24,000 Not Implemented
MZ0160 # 03 Y:2014 03 2014 REPLACE BOILER $32,000 $65,000 Not Implemented
MZ0160 # 04 Y:2014 04 2014 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $47,644 $117,000 Not Implemented
BD0451 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,189 $1,660 Not Implemented
BD0451 # 10 Y:2014 10 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,470 $600 Not Implemented
BD0451 # 12 Y:2014 12 2014 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $364 $20 Not Implemented
BD0451 # 11 Y:2014 11 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,720 $560 Not Implemented
MZ0160 # 02 Y:2014 02 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,000 $15,000 Not Implemented
BD0450 # 10 Y:2014 10 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $322 $143 Not Implemented
BD0450 # 09 Y:2014 09 2014 INSTALL OCCUPANCY SENSORS $406 $750 Not Implemented