IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

324

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0089 # 07 Y:1997 07 1997 RECOVER AND REUSE COOLING WATER $5,285 $4,500 Implemented
BD0089 # 06 Y:1997 06 1997 INSTALL OCCUPANCY SENSORS $668 $525 Not Implemented
BD0089 # 05 Y:1997 05 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $777 $0 Not Implemented
BD0089 # 04 Y:1997 04 1997 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $867 $325 Implemented
BD0089 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,151 $1,151 Implemented
BD0089 # 02 Y:1997 02 1997 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $3,615 $1,250 Not Implemented
BD0089 # 01 Y:1997 01 1997 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $3,860 $5,500 Not Implemented
WI0303 # 05 Y:1997 05 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $696 $0 Not Implemented
WI0303 # 03 Y:1997 03 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,961 $500 Not Implemented
WI0303 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,215 $3,484 Not Implemented
WI0303 # 01 Y:1997 01 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,381 $15,000 Not Implemented
WI0303 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,329 $840 Not Implemented
WI0302 # 03 Y:1997 03 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $17,370 $0 Not Implemented
WI0302 # 09 Y:1997 09 1997 INSTALL OCCUPANCY SENSORS $281 $600 Not Implemented
WI0302 # 08 Y:1997 08 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,649 $5,500 Not Implemented
WI0302 # 07 Y:1997 07 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,805 $0 Implemented
WI0302 # 06 Y:1997 06 1997 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $6,051 $7,000 Not Implemented
WI0302 # 05 Y:1997 05 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,522 $500 Implemented
WI0302 # 04 Y:1997 04 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,350 $5,000 Not Implemented
WI0302 # 02 Y:1997 02 1997 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $19,558 $25,000 Not Implemented
WI0302 # 01 Y:1997 01 1997 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $285,742 $770,000 Not Implemented
BD0085 # 01 Y:1997 01 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,667 $6,050 Not Implemented
BD0085 # 02 Y:1997 02 1997 INSTALL AUTOMATIC STACK DAMPER $5,587 $1,750 Not Implemented
BD0085 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,828 $9,330 Implemented
BD0085 # 04 Y:1997 04 1997 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,772 $300 Not Implemented