IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

174

matching recommendations
Reset
NAICS 32619 Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0814 # 11 Y:2010 11 2010 INSULATE BARE EQUIPMENT $1,111 $807 Not Implemented
UD0814 # 12 Y:2010 12 2010 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $3,484 $0 Implemented
UD0719 # 01 Y:2005 01 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $41,821 $11,000 Not Implemented
UD0719 # 02 Y:2005 02 2005 OPTIMIZE PLANT POWER FACTOR $25,553 $24,000 Not Implemented
UD0719 # 03 Y:2005 03 2005 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $13,165 $20,000 Implemented
UD0719 # 04 Y:2005 04 2005 OPTIMIZE PLANT POWER FACTOR $3,580 $4,800 Not Implemented
UD0719 # 05 Y:2005 05 2005 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,455 $12,060 Implemented
UD0719 # 06 Y:2005 06 2005 INSTALL SPECTRAL REFLECTORS / DELAMP $2,173 $3,498 Not Implemented
UD0719 # 07 Y:2005 07 2005 DISCONNECT BALLASTS $1,102 $75 Implemented
UD0719 # 08 Y:2005 08 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $583 $0 Not Implemented
UD0719 # 09 Y:2005 09 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $583 $20 Implemented
UD0719 # 10 Y:2005 10 2005 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $485 $970 Not Implemented
UD0719 # 11 Y:2005 11 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $429 $0 Not Implemented
UD0684 # 01 Y:2003 01 2003 $34,560 $0 Implemented
UD0684 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,504 $37,800 Not Implemented
UD0684 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,995 $29,250 Not Implemented
UD0684 # 04 Y:2003 04 2003 OPTIMIZE PLANT POWER FACTOR $15,725 $6,450 Not Implemented
UD0684 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,700 $770 Not Implemented
UD0684 # 06 Y:2003 06 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,792 $100 Not Implemented
UD0684 # 07 Y:2003 07 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,780 $0 Not Implemented
UD0684 # 08 Y:2003 08 2003 INSTALL COMMON HEADER ON COMPRESSORS $3,865 $0 Not Implemented
UD0684 # 09 Y:2003 09 2003 INSULATE BARE EQUIPMENT $3,252 $8,000 Not Implemented
UD0684 # 10 Y:2003 10 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,396 $613 Not Implemented
UD0684 # 11 Y:2003 11 2003 METER WASTE WATER $1,513 $2,000 Not Implemented
UD0684 # 12 Y:2003 12 2003 REPROCESS SPENT OILS ON SITE FOR RE-USE $3,323 $3,503 Not Implemented