IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

779

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0063 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $215 $36 Implemented
IP0063 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $2,624 $683 Not Implemented
IP0063 # 07 Y:2016 07 2016 RECOVER WASTE HEAT FROM EQUIPMENT $839 $586 Not Implemented
IP0063 # 08 Y:2016 08 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $268 $240 Not Implemented
IP0063 # 09 Y:2016 09 2016 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $113 $112 Implemented
IP0063 # 10 Y:2016 10 2016 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $5,185 $9,768 Implemented
IP0063 # 11 Y:2016 11 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,006 $2,156 Implemented
IP0059 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,353 $58 Implemented
IP0059 # 02 Y:2016 02 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,602 $99 Implemented
IP0059 # 03 Y:2016 03 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $76 $62 Implemented
IP0059 # 04 Y:2016 04 2016 APPLY FOR INVESTMENT INCENTIVES $1,633 $2,000 Not Implemented
IP0059 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $1,345 $3,616 Implemented
IP0059 # 06 Y:2016 06 2016 INSULATE BARE EQUIPMENT $257 $776 Not Implemented
IP0052 # 01 Y:2015 01 2015 INSTALL TIMERS AND/OR THERMOSTATS $3,077 $47 Implemented
IP0052 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $437 $9 Implemented
IP0052 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,655 $61 Implemented
IP0052 # 04 Y:2015 04 2015 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $12,878 $902 Implemented
IP0052 # 05 Y:2015 05 2015 INSULATE BARE EQUIPMENT $6,052 $2,650 Not Implemented
IP0052 # 06 Y:2015 06 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,932 $953 Not Implemented
IP0052 # 07 Y:2015 07 2015 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $10,505 $7,153 Implemented
IP0052 # 08 Y:2015 08 2015 APPLY FOR INVESTMENT INCENTIVES $12,926 $10,000 Implemented
IP0052 # 09 Y:2015 09 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,874 $4,725 Not Implemented
IP0052 # 10 Y:2015 10 2015 INSTALL OCCUPANCY SENSORS $50 $179 Not Implemented
IP0029 # 01 Y:2014 01 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,363 $210 Not Implemented
IP0029 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,383 $92 Not Implemented