IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

444

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0025 # 02 Y:2014 02 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $8,161 $0 Not Implemented
IP0025 # 03 Y:2014 03 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $471 $0 Not Implemented
IP0025 # 04 Y:2014 04 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,545 $0 Not Implemented
IP0025 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,759 $60 Not Implemented
IP0025 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,468 $0 Not Implemented
IP0025 # 07 Y:2014 07 2014 INSULATE BARE EQUIPMENT $2,123 $1,770 Not Implemented
IP0025 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $2,944 $3,961 Not Implemented
IP0016 # 01 Y:2013 01 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,083 $0 Implemented
IP0016 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $421 $0 Not Implemented
IP0016 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $197 $0 Not Implemented
IP0016 # 04 Y:2013 04 2013 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $7,284 $1,400 Implemented
IP0016 # 05 Y:2013 05 2013 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $3,008 $797 Not Implemented
IP0016 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,081 $21,876 Not Implemented
IP0016 # 07 Y:2013 07 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $708 $1,622 Not Implemented
IP0016 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,271 $1,400 Implemented
IP0016 # 09 Y:2013 09 2013 INSTALL OCCUPANCY SENSORS $301 $490 Not Implemented
IP0005 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $33,112 $0 Not Implemented
IP0005 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,540 $0 Implemented
IP0005 # 03 Y:2012 03 2012 INSULATE BARE EQUIPMENT $683 $0 Implemented
IP0005 # 04 Y:2012 04 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $997 $1,803 Not Implemented
IP0005 # 05 Y:2012 05 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $16,542 $37,000 Not Implemented
UD0776 # 01 Y:2008 01 2008 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $65,320 $0 Not Implemented
UD0776 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $48,929 $1,000 Implemented
UD0776 # 03 Y:2008 03 2008 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $47,472 $6,525 Not Implemented
UD0776 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $39,691 $0 Not Implemented