Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
81
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0089 # 09 Y:2004 | 09 | 2004 | UPGRADE OBSOLETE EQUIPMENT | $509 | $1,484 | Not Implemented |
IC0089 # 03 Y:2004 | 03 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,900 | $0 | Not Implemented |
IC0089 # 02 Y:2004 | 02 | 2004 | RECOVER MECHANICAL ENERGY | $11,613 | $3,600 | Not Implemented |
IC0089 # 01 Y:2004 | 01 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $67,444 | $15,000 | Not Implemented |
IC0089 # 04 Y:2004 | 04 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,592 | $15,794 | Not Implemented |
IC0089 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,590 | $2,400 | Not Implemented |
IC0089 # 07 Y:2004 | 07 | 2004 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $3,176 | $1,000 | Not Implemented |
IC0089 # 05 Y:2004 | 05 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $643 | $0 | Not Implemented |
IC0089 # 08 Y:2004 | 08 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $26,684 | $90,950 | Not Implemented |
IC0091 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,889 | $1,265 | Implemented |
IC0091 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,000 | $11,805 | Not Implemented |
IC0091 # 06 Y:2004 | 06 | 2004 | INSTALL OCCUPANCY SENSORS | $748 | $2,287 | Not Implemented |
IC0091 # 01 Y:2004 | 01 | 2004 | REPAIR OR REPLACE STEAM TRAPS | $1,701 | $638 | Implemented |
IC0091 # 05 Y:2004 | 05 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $466 | $1,428 | Not Implemented |
IC0091 # 02 Y:2004 | 02 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,038 | $1,315 | Implemented |
UM0270 # 05 Y:2004 | 05 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $196 | $400 | Implemented |
UM0270 # 01 Y:2004 | 01 | 2004 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $46,210 | $29,000 | Not Implemented |
UM0270 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,116 | $18,242 | Not Implemented |
UM0270 # 03 Y:2004 | 03 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,108 | $11,108 | Implemented |
UM0270 # 04 Y:2004 | 04 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,376 | $1,200 | Not Implemented |
UM0269 # 01 Y:2004 | 01 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $17,237 | $600 | Not Implemented |
UM0269 # 07 Y:2004 | 07 | 2004 | INSTALL OCCUPANCY SENSORS | $220 | $276 | Not Implemented |
UM0269 # 06 Y:2004 | 06 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,285 | $400 | Not Implemented |
UM0269 # 03 Y:2004 | 03 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,913 | $2,890 | Not Implemented |
UM0269 # 05 Y:2004 | 05 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,435 | $2,000 | Not Implemented |