IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
SIC 23 Apparel And Other Textile Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0126 # 02 Y:1984 02 1984 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $1,038 $0 Implemented
KU0122 # 12 Y:1984 12 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $169 $0 Implemented
KU0122 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,060 $5,000 Implemented
KU0122 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,649 $3,690 Implemented
KU0122 # 04 Y:1984 04 1984 INSTALL TIMERS AND/OR THERMOSTATS $3,254 $450 Implemented
KU0122 # 05 Y:1984 05 1984 KEEP BOILER TUBES CLEAN $1,926 $2,000 Implemented
KU0122 # 07 Y:1984 07 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,439 $1,985 Implemented
KU0122 # 08 Y:1984 08 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $423 $0 Implemented
KU0122 # 09 Y:1984 09 1984 INSTALL SET-BACK TIMERS $401 $50 Implemented
KU0122 # 10 Y:1984 10 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $272 $280 Implemented
KU0122 # 11 Y:1984 11 1984 INSTALL TIMERS AND/OR THERMOSTATS $211 $300 Implemented
KU0116 # 11 Y:1984 11 1984 INSULATE BARE EQUIPMENT $316 $60 Implemented
KU0116 # 06 Y:1984 06 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,515 $230 Implemented
KU0116 # 04 Y:1984 04 1984 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,182 $100 Implemented
KU0116 # 03 Y:1984 03 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,138 $0 Implemented
KU0067 # 09 Y:1982 09 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $173 $31 Implemented
KU0067 # 03 Y:1982 03 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $973 $139 Implemented
KU0067 # 02 Y:1982 02 1982 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,254 $0 Implemented
KU0021 # 05 Y:1981 05 1981 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $520 $0 Implemented
KU0021 # 04 Y:1981 04 1981 TURN OFF STEAM TRACING DURING MILD WEATHER $430 $0 Implemented
KU0021 # 03 Y:1981 03 1981 INSTALL TIMERS AND/OR THERMOSTATS $3,640 $5,000 Implemented
KU0021 # 01 Y:1981 01 1981 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,455 $4,149 Implemented