Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsSIC | 23 | Apparel And Other Textile Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0126 # 12 Y:1984 | 12 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $106 | $165 | Not Implemented |
KU0126 # 11 Y:1984 | 11 | 1984 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $59 | $40 | Implemented |
KU0126 # 10 Y:1984 | 10 | 1984 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $58 | $220 | Not Implemented |
KU0126 # 09 Y:1984 | 09 | 1984 | REPAIR AND ELIMINATE STEAM LEAKS | $196 | $150 | Implemented |
KU0126 # 08 Y:1984 | 08 | 1984 | INSTALL / REPAIR INSULATION ON STEAM LINES | $184 | $140 | Implemented |
KU0126 # 07 Y:1984 | 07 | 1984 | INSULATE BARE EQUIPMENT | $200 | $216 | Not Implemented |
KU0126 # 06 Y:1984 | 06 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $369 | $0 | Implemented |
KU0126 # 05 Y:1984 | 05 | 1984 | INSTALL TURBULATORS | $162 | $441 | Not Implemented |
KU0126 # 04 Y:1984 | 04 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $219 | $0 | Implemented |
KU0126 # 01 Y:1984 | 01 | 1984 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $598 | $1,200 | Not Implemented |
KU0126 # 02 Y:1984 | 02 | 1984 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $1,038 | $0 | Implemented |
KU0126 # 03 Y:1984 | 03 | 1984 | INSTALL SET-BACK TIMERS | $3,890 | $945 | Not Implemented |
KU0122 # 02 Y:1984 | 02 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,060 | $5,000 | Implemented |
KU0122 # 06 Y:1984 | 06 | 1984 | INSTALL TURBULATORS | $1,610 | $2,120 | Not Implemented |
KU0122 # 01 Y:1984 | 01 | 1984 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $9,129 | $5,400 | Not Implemented |
KU0122 # 03 Y:1984 | 03 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,649 | $3,690 | Implemented |
KU0122 # 11 Y:1984 | 11 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $211 | $300 | Implemented |
KU0122 # 04 Y:1984 | 04 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $3,254 | $450 | Implemented |
KU0122 # 08 Y:1984 | 08 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $423 | $0 | Implemented |
KU0122 # 10 Y:1984 | 10 | 1984 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $272 | $280 | Implemented |
KU0122 # 05 Y:1984 | 05 | 1984 | KEEP BOILER TUBES CLEAN | $1,926 | $2,000 | Implemented |
KU0122 # 12 Y:1984 | 12 | 1984 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $169 | $0 | Implemented |
KU0122 # 07 Y:1984 | 07 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,439 | $1,985 | Implemented |
KU0122 # 09 Y:1984 | 09 | 1984 | INSTALL SET-BACK TIMERS | $401 | $50 | Implemented |
KU0116 # 05 Y:1984 | 05 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,118 | $525 | Not Implemented |