IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

327

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0362 # 09 Y:1992 09 1992 REPAIR AND ELIMINATE STEAM LEAKS $869 $600 Implemented
KU0362 # 10 Y:1992 10 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $633 $502 Implemented
KU0362 # 11 Y:1992 11 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $422 $0 Not Implemented
KU0306 # 01 Y:1990 01 1990 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $12,917 $1,500 Not Implemented
KU0306 # 02 Y:1990 02 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,435 $200 Not Implemented
KU0306 # 03 Y:1990 03 1990 OPTIMIZE PLANT POWER FACTOR $20,507 $33,600 Not Implemented
KU0306 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,107 $1,966 Not Implemented
KU0306 # 05 Y:1990 05 1990 IMPROVE LUBRICATION PRACTICES $8,748 $0 Implemented
KU0306 # 06 Y:1990 06 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,643 $4,359 Implemented
KU0306 # 07 Y:1990 07 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,326 $0 Not Implemented
KU0306 # 08 Y:1990 08 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $229 $0 Not Implemented
OK0291 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,092 $668 Implemented
OK0291 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,376 $18,000 Not Implemented
OK0291 # 03 Y:1989 03 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $973 $909 Implemented
OK0291 # 04 Y:1989 04 1989 IMPROVE LUBRICATION PRACTICES $4,974 $0 Implemented
OK0291 # 05 Y:1989 05 1989 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $356 $480 Not Implemented
OK0291 # 06 Y:1989 06 1989 INSTALL TURBULATORS $1,310 $2,450 Not Implemented
OK0291 # 07 Y:1989 07 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $844 $1,500 Implemented
OK0291 # 08 Y:1989 08 1989 COVER OPEN TANKS $360 $955 Not Implemented
OK0291 # 09 Y:1989 09 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,262 $100 Implemented
OK0290 # 01 Y:1989 01 1989 INSTALL TIMERS AND/OR THERMOSTATS $1,539 $1,080 Implemented
OK0290 # 02 Y:1989 02 1989 RECOVER WASTE HEAT FROM EQUIPMENT $1,374 $1,890 Not Implemented
OK0290 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,517 $334 Implemented
OK0290 # 04 Y:1989 04 1989 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $575 $2,279 Not Implemented
KU0280 # 01 Y:1989 01 1989 INSULATE BARE EQUIPMENT $3,621 $500 Not Implemented