IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

327

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0235 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $23,631 $11,250 Implemented
MZ0235 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $941 $2,999 Not Implemented
MZ0235 # 02 Y:2017 02 2017 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,618 $5,000 Not Implemented
OK0925 # 03 Y:2015 03 2015 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $160 $214 Implemented
OK0925 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,255 $71,792 Not Implemented
OK0925 # 06 Y:2015 06 2015 USE COMPRESSOR AIR FILTERS $757 $362 Implemented
OK0925 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,762 $933 Implemented
OK0925 # 08 Y:2015 08 2015 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,748 $9,360 Not Implemented
OK0925 # 11 Y:2015 11 2015 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $5,100 $9,690 Not Implemented
OK0925 # 10 Y:2015 10 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,128 $65,326 Not Implemented
OK0925 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,024 $10,944 Not Implemented
OK0925 # 05 Y:2015 05 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $278 $229 Not Implemented
OK0925 # 07 Y:2015 07 2015 IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM $6,933 $5,596 Implemented
OK0925 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,930 $9,328 Not Implemented
OK0886 # 02 Y:2014 02 2014 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $17,969 $0 Not Implemented
OK0886 # 07 Y:2014 07 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $870 $200 Implemented
OK0886 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,721 $11,599 Implemented
OK0886 # 11 Y:2014 11 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $555 $1,660 Implemented
OK0886 # 04 Y:2014 04 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $5,915 $0 Not Implemented
OK0886 # 06 Y:2014 06 2014 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $10,866 $0 Implemented
OK0886 # 08 Y:2014 08 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $557 $0 Not Implemented
OK0886 # 10 Y:2014 10 2014 INSTALL OCCUPANCY SENSORS $1,262 $1,188 Not Implemented
OK0886 # 09 Y:2014 09 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $548 $686 Implemented
OK0886 # 03 Y:2014 03 2014 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,066 $717 Not Implemented
OK0886 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,646 $17,062 Not Implemented