IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

186

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0481 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,190 $25,840 Implemented
KU0481 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,890 $650 Not Implemented
KU0481 # 05 Y:1997 05 1997 INSTALL OCCUPANCY SENSORS $2,780 $1,500 Implemented
KU0481 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $980 $1,440 Not Implemented
KU0481 # 07 Y:1997 07 1997 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $5,460 $16,500 Implemented
KU0481 # 08 Y:1997 08 1997 $298,910 $17,200 Not Implemented
OK0419 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,780 $23,320 Not Implemented
OK0419 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,934 $15,211 Not Implemented
OK0419 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,338 $0 Implemented
OK0419 # 04 Y:1993 04 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,331 $6,008 Not Implemented
OK0419 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,053 $3,174 Not Implemented
OK0419 # 06 Y:1993 06 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $700 $0 Not Implemented
OK0419 # 07 Y:1993 07 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $275 $432 Implemented
KU0418 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,404 $8,420 Not Implemented
KU0418 # 02 Y:1993 02 1993 INSTALL OCCUPANCY SENSORS $1,191 $1,300 Not Implemented
KU0418 # 03 Y:1993 03 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,422 $2,228 Implemented
KU0418 # 04 Y:1993 04 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $711 $668 Not Implemented
KU0418 # 05 Y:1993 05 1993 USE MINIMUM SAFE OVEN VENTILATION $538 $0 Not Implemented
KU0418 # 06 Y:1993 06 1993 INSULATE BARE EQUIPMENT $134 $293 Not Implemented
OK0290 # 01 Y:1989 01 1989 INSTALL TIMERS AND/OR THERMOSTATS $1,539 $1,080 Implemented
OK0290 # 02 Y:1989 02 1989 RECOVER WASTE HEAT FROM EQUIPMENT $1,374 $1,890 Not Implemented
OK0290 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,517 $334 Implemented
OK0290 # 04 Y:1989 04 1989 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $575 $2,279 Not Implemented
KU0280 # 01 Y:1989 01 1989 INSULATE BARE EQUIPMENT $3,621 $500 Not Implemented
KU0280 # 02 Y:1989 02 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,382 $0 Implemented