Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
48
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0143 # 04 Y:1984 | 04 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $4,586 | $3,000 | Implemented |
KU0143 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,486 | $0 | Implemented |
KU0142 # 14 Y:1984 | 14 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,883 | $75 | Implemented |
KU0142 # 19 Y:1984 | 19 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $506 | $0 | Implemented |
KU0142 # 06 Y:1984 | 06 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,842 | $5,000 | Implemented |
KU0142 # 13 Y:1984 | 13 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,360 | $3,500 | Implemented |
KU0142 # 05 Y:1984 | 05 | 1984 | IMPROVE LUBRICATION PRACTICES | $12,405 | $9,000 | Implemented |
KU0142 # 04 Y:1984 | 04 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,695 | $2,171 | Implemented |
KU0143 # 13 Y:1984 | 13 | 1984 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $183 | $0 | Implemented |
KU0143 # 10 Y:1984 | 10 | 1984 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $620 | $920 | Implemented |
KU0143 # 05 Y:1984 | 05 | 1984 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $4,141 | $2,000 | Implemented |
KU0143 # 02 Y:1984 | 02 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,840 | $0 | Implemented |
KU0142 # 16 Y:1984 | 16 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,606 | $0 | Implemented |
KU0142 # 07 Y:1984 | 07 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,608 | $1,500 | Implemented |
KU0142 # 01 Y:1984 | 01 | 1984 | AIR CONDITION ONLY SPACE NECESSARY | $94,910 | $8,142 | Implemented |
KU0142 # 03 Y:1984 | 03 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $4,724 | $0 | Implemented |
KU0142 # 02 Y:1984 | 02 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $43,246 | $0 | Implemented |
KU0135 # 09 Y:1984 | 09 | 1984 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $4,203 | $100 | Implemented |
KU0135 # 02 Y:1984 | 02 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $9,768 | $0 | Implemented |
KU0135 # 03 Y:1984 | 03 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $194 | $0 | Implemented |
KU0135 # 04 Y:1984 | 04 | 1984 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,716 | $2,000 | Implemented |
KU0135 # 13 Y:1984 | 13 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,886 | $78 | Implemented |
KU0135 # 14 Y:1984 | 14 | 1984 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,763 | $3,100 | Implemented |
KU0135 # 22 Y:1984 | 22 | 1984 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $368 | $10 | Implemented |
KU0135 # 19 Y:1984 | 19 | 1984 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $905 | $300 | Implemented |