IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

413

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0106 # 02 Y:1983 02 1983 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $636 $375 Not Implemented
KU0106 # 03 Y:1983 03 1983 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,124 $0 Not Implemented
KU0106 # 04 Y:1983 04 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,926 $1,260 Not Implemented
KU0106 # 05 Y:1983 05 1983 INSTALL AUTOMATIC STACK DAMPER $2,414 $4,100 Not Implemented
KU0106 # 06 Y:1983 06 1983 USE OPTIMUM THICKNESS INSULATION $498 $100 Implemented
KU0106 # 07 Y:1983 07 1983 RECOVER WASTE HEAT FROM EQUIPMENT $1,846 $1,000 Not Implemented
KU0106 # 08 Y:1983 08 1983 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $342 $80 Implemented
KU0106 # 09 Y:1983 09 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,291 $7,951 Not Implemented
KU0106 # 10 Y:1983 10 1983 INSTALL TIMERS AND/OR THERMOSTATS $12,782 $10 Not Implemented
KU0106 # 11 Y:1983 11 1983 REDUCE VENTILATION AIR $1,554 $0 Not Implemented
KU0034 # 01 Y:1982 01 1982 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $6,130 $6,000 Not Implemented
KU0034 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,770 $3,635 Not Implemented
KU0034 # 03 Y:1982 03 1982 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,680 $0 Not Implemented
KU0034 # 04 Y:1982 04 1982 OPTIMIZE PLANT POWER FACTOR $1,240 $1,600 Not Implemented
KU0034 # 05 Y:1982 05 1982 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $450 $869 Not Implemented
KU0034 # 06 Y:1982 06 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $315 $700 Not Implemented
KU0034 # 07 Y:1982 07 1982 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $695 $600 Not Implemented
KU0025 # 01 Y:1981 01 1981 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $169 $100 Implemented
KU0025 # 02 Y:1981 02 1981 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $1,267 $1,200 Not Implemented
KU0025 # 03 Y:1981 03 1981 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $992 $0 Not Implemented
KU0025 # 04 Y:1981 04 1981 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $685 $2,076 Not Implemented
KU0025 # 05 Y:1981 05 1981 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,689 $3,748 Implemented
KU0027 # 01 Y:1981 01 1981 INSTALL AUTOMATIC STACK DAMPER $1,605 $1,800 Not Implemented
KU0027 # 02 Y:1981 02 1981 INSTALL TIMERS AND/OR THERMOSTATS $5,685 $1,600 Not Implemented
KU0027 # 03 Y:1981 03 1981 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $700 $0 Not Implemented