Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,080
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0703 # 04 Y:2005 | 04 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $53,659 | $1,739 | Not Implemented |
OK0703 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $36,596 | $39,180 | Implemented |
OK0703 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,044 | $25,020 | Implemented |
OK0703 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,204 | $1,727 | Implemented |
OK0703 # 01 Y:2005 | 01 | 2005 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $37,468 | $34,300 | Not Implemented |
OK0703 # 08 Y:2005 | 08 | 2005 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $21,564 | $1,025 | Not Implemented |
OK0703 # 07 Y:2005 | 07 | 2005 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,250 | $0 | Not Implemented |
OK0703 # 06 Y:2005 | 06 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,018 | $22,540 | Implemented |
OK0691 # 05 Y:2004 | 05 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $265 | $0 | Implemented |
OK0691 # 06 Y:2004 | 06 | 2004 | INSTALL OCCUPANCY SENSORS | $254 | $760 | Not Implemented |
OK0691 # 07 Y:2004 | 07 | 2004 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $886 | $139 | Implemented |
OK0691 # 02 Y:2004 | 02 | 2004 | EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME | $270,439 | $2,825 | Implemented |
OK0691 # 03 Y:2004 | 03 | 2004 | INSTALL SET-BACK TIMERS | $6,531 | $3,832 | Implemented |
OK0691 # 01 Y:2004 | 01 | 2004 | INSTALL EQUIPMENT TO MOVE PRODUCT | $90,154 | $5,782 | Not Implemented |
OK0691 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,036 | $559 | Implemented |
IC0078 # 04 Y:2004 | 04 | 2004 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,992 | $0 | n/a |
IC0078 # 05 Y:2004 | 05 | 2004 | REPAIR AND ELIMINATE STEAM LEAKS | $7,304 | $900 | n/a |
IC0078 # 06 Y:2004 | 06 | 2004 | KEEP SOLID FUELS / RAW MATERIALS DRY | $1,999 | $11,950 | n/a |
IC0078 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,790 | $1,700 | n/a |
IC0078 # 03 Y:2004 | 03 | 2004 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $9,520 | $33,750 | n/a |
IC0078 # 02 Y:2004 | 02 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,540 | $2,212 | n/a |
IC0078 # 10 Y:2004 | 10 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $689 | $1,252 | n/a |
IC0078 # 01 Y:2004 | 01 | 2004 | INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK | $41,155 | $96,800 | n/a |
IC0078 # 12 Y:2004 | 12 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,626 | $955 | n/a |
IC0078 # 13 Y:2004 | 13 | 2004 | KEEP SOLID FUELS / RAW MATERIALS DRY | $260 | $0 | n/a |