Search recommendations based on selected criteria.
RESET

2,295

matching recommendations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID Products Savings Cost
UK1901 # 16 Y:2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,281 $1,000
UK1901 # 13 Y:2019 COVER OPEN TANKS $4,132 $156
UK1901 # 14 Y:2019 INSULATE BARE EQUIPMENT $110 $270
UK1901 # 15 Y:2019 COVER OPEN TANKS $6,024 $5,000
UK1901 # 12 Y:2019 ELIMINATE LEAKS IN WATER LINES AND VALVES $467 $360
UK1901 # 11 Y:2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $754 $280
UK1901 # 09 Y:2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50,440 $106,123
UK1901 # 10 Y:2019 USE ADJUSTABLE FREQUENCY DRIVE TO REPLACE MECHANICAL DRIVE $265 $550
UK1901 # 08 Y:2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,566 $188
UK1901 # 07 Y:2019 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $9,301 $7,515
UK1901 # 04 Y:2019 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $22,646 $20,000
UK1901 # 05 Y:2019 INSTALL OCCUPANCY SENSORS $507 $245
UK1901 # 06 Y:2019 USE MORE EFFICIENT LIGHT SOURCE $283 $520
UK1901 # 01 Y:2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,739 $5,715
UK1901 # 02 Y:2019 ELIMINATE OR REDUCE COMPRESSED AIR USED FOR COOLING, AGITATING LIQUIDS, MOVING PRODUCT, OR DRYING $4,381 $750
Back to Top