IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

53

matching recommendations
Reset
SIC 205 Bakery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1406 # 08 Y:2014 08 2014 ADD AREA LIGHTING SWITCHES $1,572 $620 Implemented
UK1406 # 07 Y:2014 07 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,190 $0 Implemented
UK1406 # 05 Y:2014 05 2014 UPGRADE CONTROLS ON COMPRESSORS $13,621 $15,000 Implemented
UK1406 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $930 $1,845 Implemented
UK1406 # 03 Y:2014 03 2014 REPLACE BOILER $18,647 $49,610 Implemented
UK1406 # 02 Y:2014 02 2014 PREHEAT COMBUSTION AIR WITH WASTE HEAT $20,868 $60,000 Implemented
UK1406 # 01 Y:2014 01 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $84,218 $192,800 Implemented
UL0148 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,644 $3,850 Implemented
UL0148 # 03 Y:1996 03 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,558 $2,000 Implemented
UL0148 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,550 $4,024 Implemented
TN0498 # 07 Y:1993 07 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,219 $1,940 Implemented
TN0498 # 06 Y:1993 06 1993 INSULATE BARE EQUIPMENT $2,696 $8,300 Implemented
TN0498 # 09 Y:1993 09 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $633 $95 Implemented
TN0498 # 10 Y:1993 10 1993 INSULATE BARE EQUIPMENT $478 $193 Implemented
TN0498 # 05 Y:1993 05 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,032 $1,000 Implemented
TN0498 # 02 Y:1993 02 1993 COVER OPEN TANKS $12,312 $7,480 Implemented
TN0498 # 01 Y:1993 01 1993 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $17,526 $20,380 Implemented
TN0346 # 08 Y:1988 08 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $529 $990 Implemented
TN0346 # 06 Y:1988 06 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,747 $0 Implemented
TN0346 # 05 Y:1988 05 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,550 $1,850 Implemented
TN0346 # 04 Y:1988 04 1988 REPAIR AND ELIMINATE STEAM LEAKS $1,960 $270 Implemented
TN0346 # 03 Y:1988 03 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,714 $640 Implemented
TN0346 # 01 Y:1988 01 1988 INSTALL / REPAIR INSULATION ON STEAM LINES $14,628 $3,357 Implemented
TN0334 # 01 Y:1988 01 1988 INSTALL / REPAIR INSULATION ON STEAM LINES $14,941 $2,726 Implemented
TN0334 # 04 Y:1988 04 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,482 $160 Implemented