IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

81

matching recommendations
Reset
SIC 331 Blast Furnace And Basic Steel Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1403 # 08 Y:2014 08 2014 MINIMIZE WATER USAGE $68,700 $5,200 Not Implemented
UK1403 # 11 Y:2014 11 2014 UPGRADE CONTROLS ON COMPRESSORS $14,129 $40,000 Not Implemented
UK1403 # 10 Y:2014 10 2014 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $250,000 $100,000 Not Implemented
UK1403 # 12 Y:2014 12 2014 USE PHOTOCELL CONTROLS $3,867 $947 Implemented
UK1403 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,517 $0 Not Implemented
UK1403 # 03 Y:2014 03 2014 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,250 $0 Implemented
UK1403 # 01 Y:2014 01 2014 OPTIMIZE PLANT POWER FACTOR $56,910 $52,500 Not Implemented
UK1403 # 14 Y:2014 14 2014 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $318,750 $0 Not Implemented
UK1403 # 13 Y:2014 13 2014 UPGRADE CONTROLS ON COMPRESSORS $3,017 $0 Not Implemented
UK1312 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,570 $504 Implemented
UK1312 # 13 Y:2013 13 2013 INSULATE BARE EQUIPMENT $4,473 $3,055 Not Implemented
UK1312 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,416 $6,400 Not Implemented
UK1312 # 03 Y:2013 03 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $23,264 $5,000 Implemented
UK1312 # 02 Y:2013 02 2013 UPGRADE OBSOLETE EQUIPMENT $54,717 $520,000 Implemented
UK1312 # 01 Y:2013 01 2013 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $138,049 $23,400 Not Implemented
UK1312 # 09 Y:2013 09 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $815 $0 Implemented
UK1312 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,121 $2,121 Not Implemented
UK1312 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,529 $2,581 Not Implemented
UK1312 # 06 Y:2013 06 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,527 $1,376 Implemented
UK1312 # 12 Y:2013 12 2013 ADJUST BURNERS FOR EFFICIENT OPERATION $5,094 $8,500 Not Implemented
UK1312 # 11 Y:2013 11 2013 INSTALL REPLACEMENT DOORS $49,300 $270,900 Not Implemented
UK1312 # 10 Y:2013 10 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $109,909 $9,000 Implemented
UL0238 # 03 Y:2000 03 2000 $15,288 $80,000 Not Implemented
UL0238 # 02 Y:2000 02 2000 DISCONNECT BALLASTS $12,291 $1,236 Implemented
UL0238 # 01 Y:2000 01 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,743 $0 Not Implemented