IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

122

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL0230 # 07 Y:1999 07 1999 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $1,500 $0 Implemented
UL0230 # 06 Y:1999 06 1999 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $83,800 $80,000 Implemented
UL0230 # 05 Y:1999 05 1999 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $297,462 $167,000 Not Implemented
UL0230 # 04 Y:1999 04 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,447 $0 Not Implemented
UL0230 # 09 Y:1999 09 1999 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $1,308 $2,270 Not Implemented
UL0230 # 08 Y:1999 08 1999 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $2,893 $2,120 Implemented
UL0230 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,394 $40 Implemented
UL0230 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,353 $500 Implemented
UL0230 # 03 Y:1999 03 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,860 $0 Not Implemented
UL0233 # 05 Y:1999 05 1999 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $7,011 $9,500 Implemented
UL0237 # 03 Y:1999 03 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $5,309 $0 Not Implemented
UL0237 # 02 Y:1999 02 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $11,512 $0 Implemented
UL0237 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,611 $100 Not Implemented
UL0233 # 04 Y:1999 04 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $5,027 $4,475 Implemented
UL0233 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,678 $261 Not Implemented
UL0233 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $594 $0 Not Implemented
UL0233 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,210 $50 Implemented
UL0233 # 06 Y:1999 06 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $10,120 $0 Not Implemented
UL0234 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $480 $131 Not Implemented
UL0234 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,233 $20 Not Implemented
UL0234 # 04 Y:1999 04 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,824 $0 Not Implemented
UL0234 # 03 Y:1999 03 1999 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE $11,305 $800 Not Implemented
UL0234 # 05 Y:1999 05 1999 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $62,180 $300 Implemented
UL0229 # 03 Y:1999 03 1999 CONSOLIDATE FREIGHT SHIPMENTS AND/OR DELIVERIES $33,688 $15,000 Implemented
UL0236 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,472 $20 Implemented