Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
122
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL0230 # 07 Y:1999 | 07 | 1999 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $1,500 | $0 | Implemented |
UL0230 # 06 Y:1999 | 06 | 1999 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $83,800 | $80,000 | Implemented |
UL0230 # 05 Y:1999 | 05 | 1999 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $297,462 | $167,000 | Not Implemented |
UL0230 # 04 Y:1999 | 04 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,447 | $0 | Not Implemented |
UL0230 # 09 Y:1999 | 09 | 1999 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $1,308 | $2,270 | Not Implemented |
UL0230 # 08 Y:1999 | 08 | 1999 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $2,893 | $2,120 | Implemented |
UL0230 # 01 Y:1999 | 01 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,394 | $40 | Implemented |
UL0230 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,353 | $500 | Implemented |
UL0230 # 03 Y:1999 | 03 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,860 | $0 | Not Implemented |
UL0233 # 05 Y:1999 | 05 | 1999 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $7,011 | $9,500 | Implemented |
UL0237 # 03 Y:1999 | 03 | 1999 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $5,309 | $0 | Not Implemented |
UL0237 # 02 Y:1999 | 02 | 1999 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $11,512 | $0 | Implemented |
UL0237 # 01 Y:1999 | 01 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,611 | $100 | Not Implemented |
UL0233 # 04 Y:1999 | 04 | 1999 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $5,027 | $4,475 | Implemented |
UL0233 # 02 Y:1999 | 02 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,678 | $261 | Not Implemented |
UL0233 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $594 | $0 | Not Implemented |
UL0233 # 01 Y:1999 | 01 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,210 | $50 | Implemented |
UL0233 # 06 Y:1999 | 06 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $10,120 | $0 | Not Implemented |
UL0234 # 02 Y:1999 | 02 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $480 | $131 | Not Implemented |
UL0234 # 01 Y:1999 | 01 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,233 | $20 | Not Implemented |
UL0234 # 04 Y:1999 | 04 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $4,824 | $0 | Not Implemented |
UL0234 # 03 Y:1999 | 03 | 1999 | INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE | $11,305 | $800 | Not Implemented |
UL0234 # 05 Y:1999 | 05 | 1999 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $62,180 | $300 | Implemented |
UL0229 # 03 Y:1999 | 03 | 1999 | CONSOLIDATE FREIGHT SHIPMENTS AND/OR DELIVERIES | $33,688 | $15,000 | Implemented |
UL0236 # 01 Y:1999 | 01 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,472 | $20 | Implemented |