IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0646 # 11 Y:2002 11 2002 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $311 $640 Not Implemented
UD0646 # 10 Y:2002 10 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $379 $499 Implemented
UD0646 # 09 Y:2002 09 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $613 $1,431 Not Implemented
UD0646 # 08 Y:2002 08 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,092 $0 Not Implemented
UD0646 # 07 Y:2002 07 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,342 $61 Not Implemented
UD0646 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,390 $5,088 Not Implemented
UD0646 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $2,204 $3,320 Not Implemented
UD0646 # 04 Y:2002 04 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,685 $2,000 Implemented
UD0646 # 03 Y:2002 03 2002 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $9,581 $675 Not Implemented
UD0646 # 02 Y:2002 02 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $25,468 $12,700 Implemented
UD0646 # 01 Y:2002 01 2002 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $33,646 $32,000 Implemented
UD0643 # 02 Y:2002 02 2002 REPLACE BOILER $24,688 $93,993 Not Implemented
UD0643 # 11 Y:2002 11 2002 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $254 $300 Not Implemented
UD0643 # 10 Y:2002 10 2002 USE PHOTOCELL CONTROLS $1,370 $825 Not Implemented
UD0643 # 09 Y:2002 09 2002 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,882 $1,000 Not Implemented
UD0643 # 08 Y:2002 08 2002 INSTALL TIMERS AND/OR THERMOSTATS $4,481 $1,000 Not Implemented
UD0643 # 07 Y:2002 07 2002 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $4,989 $11,500 n/a
UD0643 # 06 Y:2002 06 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,223 $268 Not Implemented
UD0643 # 05 Y:2002 05 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,904 $25,000 n/a
UD0643 # 04 Y:2002 04 2002 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $11,525 $0 Not Implemented
UD0643 # 03 Y:2002 03 2002 BURN A LESS EXPENSIVE GRADE OF FUEL $18,168 $0 Not Implemented
UD0643 # 01 Y:2002 01 2002 BURN A LESS EXPENSIVE GRADE OF FUEL $32,894 $90,000 n/a
UM0201 # 01 Y:2002 01 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $972,000 $3,390,000 n/a
UM0201 # 02 Y:2002 02 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $493,600 $1,060,000 n/a
UM0201 # 03 Y:2002 03 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $519,147 $1,100,000 Not Implemented