IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

140

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0238 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $730 $0 Not Implemented
LL0238 # 10 Y:2005 10 2005 ELIMINATE LEAKS IN WATER LINES AND VALVES $7,299 $1,000 Implemented
LL0141 # 01 Y:2002 01 2002 USE POWER DURING OFF-PEAK PERIODS $189,217 $0 Implemented
LL0141 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,007 $2,985 Implemented
LL0141 # 03 Y:2002 03 2002 OPTIMIZE PLANT POWER FACTOR $15,140 $23,730 Not Implemented
LL0141 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,695 $1,485 Implemented
LL0141 # 05 Y:2002 05 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,273 $0 Not Implemented
LL0141 # 06 Y:2002 06 2002 USE PHOTOCELL CONTROLS $2,062 $51 Not Implemented
LL0113 # 01 Y:2001 01 2001 INSULATE BARE EQUIPMENT $1,924 $1,802 Not Implemented
LL0113 # 02 Y:2001 02 2001 INSULATE BARE EQUIPMENT $13,907 $845 Not Implemented
LL0113 # 03 Y:2001 03 2001 USE OPTIMUM THICKNESS INSULATION $62,646 $51,608 Not Implemented
LL0113 # 04 Y:2001 04 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $23,727 $12,240 Not Implemented
LL0113 # 05 Y:2001 05 2001 USE PHOTOCELL CONTROLS $1,979 $203 Not Implemented
LT0131 # 01 Y:1988 01 1988 RECOVER WASTE HEAT FROM EQUIPMENT $800 $2,400 Implemented
LT0131 # 02 Y:1988 02 1988 REDESIGN PROCESS $21,900 $20,130 Not Implemented
LT0131 # 03 Y:1988 03 1988 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $930 $1,760 Implemented
LT0131 # 04 Y:1988 04 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $138 $362 Implemented
LT0131 # 05 Y:1988 05 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $284 $0 Implemented
LT0131 # 06 Y:1988 06 1988 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $860 $100 Implemented
LT0131 # 08 Y:1988 08 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $85 $0 Implemented
LT0121 # 01 Y:1988 01 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $22,200 $7,900 Not Implemented
LT0121 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,200 $0 Not Implemented
LT0121 # 03 Y:1988 03 1988 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $472 $268 Not Implemented
LT0121 # 04 Y:1988 04 1988 INSTALL TIMERS AND/OR THERMOSTATS $553 $150 Not Implemented
LT0096 # 01 Y:1987 01 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $850 $1,050 Implemented